Dewatering daily log, World Trade Center, Apr 2002

Machine-extracted title · confidence 28%

Daily log of dewatering operations and maintenance activities at World Trade Center site during April 2002.

NYC-WTC_000419087
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MORETRENCH AMERICAN CORPORATION Page of

Date 4/6/02 DAILY LOG Day Saturday > ontractor Bovis Job Name World Trade Center Job No. 4906

Work Performed Today Weather Operate and maintain dewatering system on Liberty street.

Operate and maintain dewatering system on West street. Temp AM PM Operate and maintain dewatering system in TA pump pit in the 1 & 9.

Operate and maintain dewatering system in basement of south projection. Safety Meeting Operate and maintain dewatering system in the Hudson station.

Cut up 4* PE discharge line on Washington. Grout crew speed pluged crack on G41 - G42 Work Force Day

and grouted in 1* nipples to chem grout thru afterwards. They also preported tiebacks on Foreman

panels W23,W24,W28 and W29. Preformed daily maintaince on small generators and sump Technician 1 pumps. Sand Hogs 4 Operating Eng. 7

Drillers 0

Oilers 0

Total 12

EQUIPMENT

e General/Subcontractors Progress Equipment

5 - Hilti Concrete Drill Cat IT 28 with forks

4- grout pumps

1- lOOKW Gen Set 12hrs

12hrs

12hrs

8 - 5555] watt generator 2-3‘ Trash Pump 12hrs

1 -6' Diesel pump 2-2° Test Pump 12hrs

5 • 30hp tunnel pump with controls 12hrs 3 ■ 3hp Pump & contri 12hrs

1'275 Gal dual contained fuel tank 12hrs 6 -2hp pumps & contr 12hrs

l-7hp midriver pump 12hrs SOOgal Settling Tank 12hrs 1 - Storage container 71.5hp pump& con 12hrs

Extra Work 1- Pump op trailer 2-12' Cutoff Saw 12hrs

300' of 6" Alum. Pipe and 8 flowmeters. 3- Service Truck 12hrs

l-5hp pump and control 8-Road Plates 12hrs

2 control panels 2-75 kw gen sets 12hrs

rX4'’ Fusion Machine 15-lhp pump &co 12hrs 4- Diesel Gators 4 • 88 KW generators 12hrs

n * - 2‘ sump pumps 2- Double T. S. 12hrs

7 M T A

Q2._419211

CITY_21MC100_001058570 NYC-WTC_000419087

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419087Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →