NYC 9/11 Public Portal Document
September 25.2001 (9:20am)
Final Preliminary Data
New York City/ World Trade Center Sampling Activities
Newtown Creek STP/ Manhattan Pumping Station
Preliminary Results Summary: Laboratory data for all parameters has been received. All
parameters were either below permit limits in final effluent, or below levels of concern. The
WTC disaster does not appear to have effected influent to the plant.
EPA Personnel: Randy Braun
Stephen Hale
Richard Coleates
Sampling Date: September 15 - 16, 2001
Sampling Time: 24-hour composites beginning at approximately 1:00pm on 9/15/01
Location: Three sampling locations: 1) Newtown Creek STP final treated discharge, 2) Influent
to Newtown Creek STP from Brooklyn and Queens, and 3) 13* Street pump
station (contains all waste water from southern Manhattan, including WTC area).
Sample Matrix: Water
Analytes (Laboratory):
PCBs (Region 2)
PAHs (Region 2)
Metals (Region 2)
BOD5 (Region 2)
TSS (Region 2)
Dioxins/Furans (contract lab - Paradigm Analytical)
Asbestos (contract lab)
Preliminary Results:
Dioxins/Furans: Two dioxin and two furan compounds were detected in one or more
samples. The total TEQ for the Influent about twice as high as the TEQ for the Midtown
Pumping Station and the Effluent samples. The TEQ for the Influent was about 8 times
less than the total TEQ for the Rector St. Runoff sample collected on 09/14/01, and is
also less than the TEQ for the highest sample collected by the Harbor CARP program (22
pg/L).
Pumping Station: OCDD was reported in the midtown pumping station sample at
103 J pg/L, which is about 50 times less than the concentration reported for this
compound in Rector St. runoff. The TEQ for the Midtown pumping station is 8.5
pg/L, compared with 122 pg/L for the runoff sample.
CITY_21MC100_0 06654273
NYC-WTC_000418620