NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 29 pages

NYC DEP air sampling resuls, 2001

Machine-extracted title · confidence 35%

Air sampling results for 130 [name] with DEP correspondence details.

NYC-WTC_000418094–000418122
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document f-wssAiiKszcjii:—i-.- ks-w f Ljitte k£utzE-’r?e^«ivnnrtASS^'r-^-'.'w,e^.-rte:u'.:zs;,'

From:TimDoreSioi men7513 Tfl;Sttnl^Baldwin Date 4,18(132 Timeil ilMMPM Pi«e2of2

■Y'

DONOHOE ENVIRONMENTAL, INC. 39Boyvery il684 N eye York. Ne}v York 1 0002

Phone ; 2i 2 260-981 $ Fax:212 673-7215

^18. 2002

Ms, Carl Lutchmedial N.Y.C. D.B.P., Asbestos Control Program 59-17 Junction Blvd., Sth Floor Queen#, NY 1136S-5137

Re- Proposed Scope of Worf* in the elevator ihsft, on the entrance landing and roof at ISO Franklin Street, XYC.

Dear Mr, Lutdiniedial;

I am snbniittinj foi your approval e work plan for the emergency clean up of lysbestce containing dust from the elevator shaft at the above address, We propose the Lollowing:

1. Clean up will he perfonrwd by s licensed ssbestoe abaSemaat contfactor using NT'C DSP and NYS DOL Certified Asbestos Handlers, 2, Work area will he defined as the roof entrance landing and elevator shaft, 3. An airlock will be constructed at the doorway to the elevator machine room in the basement and on the roof, 4, Al! electric will be supplied by the building and ail extension cords will have yoand fault interrupters. J, Once the air locks ere set up, oleen up will begin following clean up procedures in NYC Title IS, Chapter 1, 6. Critical banicis will be placed in the bawroent of the elevator shaft and on the skylight 7. Aiea air monitoring and OSHA monitoring will be performed during tire clean up, 8, Upon achievir^ visual cleerance on ell floors of the elevator shaft IBM air sampling will be ped'onned on each Hoch-, 9, All removal and air monitoring will be performed in accordance with NYC Title 15, Chapter 1, 10, All clearance sir sampling and waste manifests will be forwarded to the building owner upon corupletion. 11. An Emergency Notification will be sent to the NYC DEP within 24 hours of the start of the project, The Notification will be for the emergency clean up of B,500 square feet of asbestos contairung dust.

Very Truly Yours,

rimethy I Donohoe Snvironmfntai, Ine.

09658 CITY_21MC100_011970669

NYC-WTC_000418114

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000418114Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →