PCM air sample analysis summary, WTC site, Nov 2, 2001
Machine-extracted title · confidence 95%
Riverpoint Consulting laboratory report summarizing personal air sample results for asbestos fibers collected at the World Trade Center site on November 2, 2001.
Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
cnata V^onsulting
c
kJcrviccs, Inc.
304 Edgemont Terrace Teaneck NJ 07666 201 692 7967 fax 201 678 1789
Certificate of Analysis
Client: Riverpoint, Inc Project Location: WTC, NYC Analysis Date: November 2, 2001
Client#: 101171 Work Area: N/A RCS Project # 126
PCM Air Sample Analysis Summary
Lab ID Client ID Sample Description Date Flow Rate Duration Volume Fibers Fields Density Fiber Cone. LOD
Collected [liters/mrn.] [minutes] [liters] [Fiber/mm"] [Fiber/cc] [Fiber/cc]
3138 011102 Park Place and Church 11/2/01 15.00 45 675.0 0.00 100 0.00 <LOD 0.004
3139 021102 Park Place and Greenwich__________ 11/2/01 15.00 45 675.0 7.50 100 9.55 0.005 0.004
3140 031102 Murray and Church________________ 11/2/01 15.00 45 675.0 5.00 100 6.37 <LOD 0.004
3141 041102 Murray and Greenwich_____________ 11/2/01 15.00 45 675.0 6.00 100 7.64 0.004 0.004
3142 051102 Fulton and Church 11/2/01 15.00 45 675.0 10.00 100 12.74 0.007 0.004
3145 061102 Warren and North End_____________ 11/2/01 14.00 45 630.0 7.50 100 9.55 0.006 0.004
3146 071102 West Street and Warren____________ 11/2/01 14.50 45 652.5 4.00 100 5.10 <LOD 0.004
3152 081102 Gateway Plaza___________________ 11/2/01 15.00 45 675.0 4.00 100 5.10 <LOD 0.004
3153 091102 South End Avenue and Albany_______ 11/2/01 15.00 45 675.0 3.00 100 3.82 <LOD 0.004
3154 101102 West and Albany_________________ 11/2/01 14.25 50 712.5 2.00 100 2.55 <LOD 0.004
3155 111102 Rector Place by park______________ 11/2/01 15.00 45 675.0 7.00 100 8.92 0.005 0.004
3156 121102 3rd Place and West End and Waterside 11/2/01 15.00 45 675.0 4.00 100 5.10 <LOD 0.004
3157 131102 West end of West Thames 11/2/01 14.90 45 670.5 4.00 100 5.10 <LOD 0.004
3147 141102 Park Place and River Terrace________ 11/2/01 14.75 45 663.8 3.00 100 3.82 <LOD 0.004
3148 151102 River Terrace and Chambers________ 11/2/01 14.75 53 781.8 3.00 100 3.82 <LOD 0.003
3149 161102 River Terrace and Warren 11/2/01 14.75 55 811.3 6.00 100 7.64 0.004 0.003
3150 171102 North End and Park Place 11/2/01 14.50 45 652.5 2.50 100 3.18 <LOD 0.004
3151 181102 Vesey and River Terrace___________ 11/2/01 15.00 45 675.0 5.00 100 6.37 <LOD 0.004
3143 191102 Trinity Place and Thames___________ 11/2/01 15.00 45 675.0 3.00 100 3.82 <LOD 0.004
3144 201102 Vesey and West Broadway__________ 11/2/01 15.00 45 675.0 9.50 100 12.10 0.007 0.004
3158 FBI Field Blank 1_____________________ 11/2/01 0.00 0 0.0 0.00 100 0.00 N/A N/A
3159 FB2 Field Blank 2 11/2/01 0.00 0 0.0 0.00 100 0.00 N/A N/A
o
H
ELAP ID No. 11750 Expires 12:01 AM, April 1, 2002 Analysis Method: Phase Contrast Microscopy, NIOSH Method 7400
NJ
Limit of Quantitation (LOQ) = 102 [Eiber/mm^]
S
o Limit of Detection (LOD) = 7 [Eiber/mm^]
o
o
Io
o
co
Analysis Performed By: A4 ^.24
co Marek Pawlik
kD
Oh Laboratory Director
(JI
o
Oh
NYC-WTC_000417595
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000417595Source: NYC Law Department, mirrored locally
Riverpoint Consulting laboratory report summarizing personal air sample results for asbestos fibers collected at the World Trade Center site on November 2, 2001.
Riverpoint Consulting laboratory report summarizing personal air sample results for asbestos fibers collected at the World Trade Center site on November 2, 2001.
Riverpoint Consulting laboratory report summarizing personal air sample results for asbestos fibers collected at the World Trade Center site on November 2, 2001.