NYC 9/11 Public Portal Document
New York City Department of Environmental Protection Bureau of Environmental Compliance WTC Unoccupied Building Monitoring Program 125 Cedar Street Scope of Work Project #WTC_UNA
A mandatory pre-bid meeting is scheduled for August 28, 2002 at 1:00 P.M. at 125 Cedar Street, Building Lobby, New York, N.Y. This conference will include a walk through of the entire building.
Background
A follow-up visit to 125 Cedar Street revealed debris and significant dust accumulation present on surfaces throughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.
Purpose
The Monitoring Contractor shall provide personnel experienced, trained, and certified in environmental sampling and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories and a penthouse-5,000 to 6,000 square feet per floor). The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoring Contractor shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, crystalline silica and mercury.
An accredited laboratory shall perform all sample analyses.
The Work shall be performed 24 hours per day, seven (7) days per week
Contract Term
This contract shall be in force for 90 consecutive calendar days from the DEP commencement date. Contractors must be prepared to mobilize within 72 hours of the contract award.
Air Monitoring/Construction Inspection Services
Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring Contractor shall provide individuals certified as project monitors and air sampling technicians to perform daily air sampling and inspections from the commencement of the project through final air clearance sampling. The Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work area preparation and cleaning phases of the building interiors.
1 of 5
CITY_21MC100_013465762 NYC-WTC_000416644
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000430503
Plan and responsibilities for on-site asbestos air monitoring and debris cleanup.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444855
Procurement and scope document for asbestos air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452652
DEP scope of work for on-site asbestos air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446586
Chain-of-custody document detailing asbestos sample monitoring setup for 125 Cedar Street decontamination.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435590
DEP memo outlining pre-bid meeting and asbestos monitoring for WTC renovation.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445979
Pre-bid/scope memo for asbestos air monitoring and on-site staff requirements.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433215
DEP scope of work for 125 Cedar Street interior dust monitoring and abatement oversight.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435996
Chain of custody noting pre-bid walk-through at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433703
DEP/WTC project scope describing building debris, dust, and required asbestos air monitoring during cleaning.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452493
DEP pre-bid meeting notice and background for asbestos cleaning at WTC site.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446617
Chain-of-custody describing pre-bid/site walkthrough and asbestos monitoring setup.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284079
Mandatory pre-bid and monitoring scope for asbestos abatement and air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000279056
Pre-bid scope and coordination for asbestos abatement monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000430503
Plan and responsibilities for on-site asbestos air monitoring and debris cleanup.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445979
Pre-bid/scope memo for asbestos air monitoring and on-site staff requirements.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444855
Procurement and scope document for asbestos air monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435996
Chain of custody noting pre-bid walk-through at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446617
Chain-of-custody describing pre-bid/site walkthrough and asbestos monitoring setup.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000430503
Plan and responsibilities for on-site asbestos air monitoring and debris cleanup.
Similar indexed content
NYC-WTC_000444855
Procurement and scope document for asbestos air monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000452652
DEP scope of work for on-site asbestos air monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000446586
Chain-of-custody document detailing asbestos sample monitoring setup for 125 Cedar Street decontamination.
Similar indexed content
NYC-WTC_000435590
DEP memo outlining pre-bid meeting and asbestos monitoring for WTC renovation.
Similar indexed content