NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Transmission lines for NYC grid

Machine-extracted title · confidence 13%

NYC electric demand and proposed transmission capacity and routes.

NYC-WTC_000412609–000412610
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CRAIN'S, MONDAY. SEPTEMBER 24. 2001 While the city now has seven transmission lines running to New Jersey, upstate New York and Long Island, these cables can handle only 5,000 megawatts of electricity and often work at full capacity during summer heat waves. Still, there are enormous finan­ cial and logistical obstacles to build­ ing new transmission capacity. De­ velopers must secure federal, state and city permits. They must also at­ tract enough potential customers to secure financial backing for what are often multibillion-dollar construc­ tion projects. In addition, transmission devel­ opers must reach agreements with . Consolidated Edison Tnc. to con­ nect to the city power grid. Only two substations in the city are ca­ pable of handling electricity from large underwater cables, one at West 49th Street in Manhattan and one in western Brooklyn. “There’s a finite system,” says Joe Oates, Con Ed vice president of energy management. “If all these things were built, we would not be able to accommodate them all at the same time.”

Switching currents The project furthest along is also the most ambitious. Atlantic Ener­ gy Partners, a Maine-based consor­ tium, is proposing a S3 billion, 2,000-mile system of transmission cables linking New Brunswick, Nova Scotia, Maine and Boston to New York and Long Island. The system would also link the city to New Jersey's power grid. The Federal Energy Regulatory Commission in June gave Atlantic Energy permission to seek potential customers, which will test whether there is a market for its system. Atlantic Energy is proposing us- . ing a novel technology of direct current, instead of the alternating current that is used in most trans­ mission lines. DC lines don't create electromagnetic fields, resulting in less environmental Impact, and they lose less power over long distances. The project with the best chance of approval is still in the formative stages. PSEG Power, an affiliate of the New Jersey utility PSEStG, is considering building a 1,200-mcga- watt line that would connect the city to a power plant it's building in Ridgefield, N.J. The 7.5-mile cable would be dedicated to the plant, en­ abling PSEG to price its energy ar the same rates charged by New York City plants, which generally charge more than New Jersey plants. Three other projects have also been proposed. I

CITY_21MC100_011829975

NYC-WTC_000412610

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000412610Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →