NYC 9/11 Public Portal Document
Part 2
Equipment Specifications
§1-61 Materials and Equipment
§1-61 Materials and Equipment. The materials and equipment used
during all abatement activities shall conform with the following;
(a) During abatement activities, replacement materials shall be stored
outside the work area in a manner to prevent contamination.
(b) When asbestos-containing material that has been used for fireproofing
or insulation is removed, the replacement material shall comply with all
applicable provisions ofthe New York City Administrative Code and regulations.
(c) For plasticizing, polyethylene sheeting with 6-mil thickness or greater,
in sizes to minimize the frequency of joints, shall be employed.
(d) Duct tape and selected adhesive shall be capable of sealing joints of
adjacent sheets of polyethylene, facilitating attachment of polyethylene
sheets to finished or unfinished surfaces, and of adhering under both dry and
wet conditions, including during the use of amended water.
(e) Airtight and watertight containers shall be provided to receive and
retain any asbestos-containing waste materials. Plastic bags used for waste
storage or disposal shall be a minimum of 6-mil in thickness. All containers
shall be labeled in accordance with OSHA Regulation 29 CFR 1926.58K(2)(ii)
and (iii).
(f) Materials used to enclose ACM shall be impact resistant and assembled
to be airtight. Gypsum panels taped at the seams, tongue and groove boards,
and boards with spline joints all qualify.
(g) Hand power tools used to drill, cut into, or otherwise disturb ACM shall
be equipped with HEPA filtered local exhaust ventilation.
5801 RCNY 5-31-98
CITY_21MC10 0__0 062 42 9 72
NYC-WTC_000411841
OCR can misread numbers and units. Confirm readings against the page image before using them.