NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-23

(d) Modification of or deviation from the information provided in any notification submitted to the Department of Buildings under this section shall immediately be reported in writing directly to DEP if the change refers to the identity of the building owner or ACM removal contractor or the air monitor­ ing firm; or the amount of ACM to be removed; or the dates of the project; or the specific project location. A notification may be modified no more than twice. A modification is valid only if it is received by the DEP prior to the previously filed date of completion, except for start date changes which must be received by the original start date. Thereafter, a new notification submit­ ted directly to the department will be required. A notification to Department of Buildings or DEP shall be valid for one year from the date of original filing.

§1-23 Alterations/Renovations/Modifications. As early as possible be­ fore an alteration, renovation, or modification takes place, or changes iiran alteration, renovation or modification occur, the building owner shall be responsible for determining the absence or presence of friable asbestos-con­ taining material which will be disturbed during the course of the alteration, renovation or modification activities. The owner of the building or the author­ ized agent shall comply with the notification requirements of this section regarding friable asbestos-containing material. (a) Exceptions. The following activities do not constitute an alteration, renovation or modification of a building or structure; therefore, the filing of a notification shall not be required as a pre-requisite for issuance of a Buildings Department plan approval. However, if friable asbestos-containing material is discovered during the course of any of the following activities, an “Asbestos Inspection Report” shall be filed immediately with DEP according to §§1-25 or 1-26.

Accessory Parking Awnings Candy or News Stands Certificate of Occupancy requiring no work Change of use or legalization requiring no work Cranes Curb Cuts Debris chutes (not to be used for ACM) Elevator equipment (not including construction & enclosure of shaft) Emergency power not involving hard wiring (i.e. battery packs) Erecting of fire escape Exterior concrete work (e.g. sidewalks)

5733 RCNY 5-31-98

CITY_21MC100_006242954

NYC-WTC_000411823

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411823Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →