NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

Asbestos regulations, Part 763

Machine-extracted title · confidence 41%

Table of contents for asbestos in schools, 15 U.S.C. 2605 references.

NYC-WTC_000411786–000411800
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§ 762.87 samples from each homogeneous area of friable §762.84 for inclusion in the management plan miscellaneous material that is not assumed to be within 30 days of the assessment. ACM. (b.i The inspecior shall classify and give reasons (d) Nonfriubie suspecieb ACBM. If any homo­ in the written assessment for classifying the geneous area of nonfnable suspected ACBM is not ACBM and suspected ACBM assumed lo be ACM assumed to be ACM, then an accredited inspector in the school building into one of the following shall collect, in a manner sufficient to determine categones: whether the material is ACM or not ACM, bulk (1) Damaged or significantly damaged thermal samples from the homogeneous area of nonfriable system insulation ACM. suspected ACBM that is not assumed to be ACM (2) Damaged friable surfacing ACM. (3. Significantly damaged friable surfacing §763.87 Analysis. ACM (a) Local education agencies shall have bulk 14 Damaged or significantly damaged friable samples, collected under §763.86 and submitied miscellaneous .ACM for analysis, analyzed for asbestos using labora­ (5 ACB.M with potential for damage, tories accredited by the National Bureau of Stand­ i6i ACBM with potential for significant dam­ ards (NBS). Local education agencies shall use age laboratories which have received interim accredita­ '■ Ant remaining fnable ACBM or friable sus­ tion for polarized light microscopy (PLM) analysis pected aCBM under the EPA Interim Asbestos Bulk Sample I: Assessment may include the following con­ Analysis Quality Assurance Program until the siderations NBS PLM laboratory accreditation program for i L-caiicr and the amount of the material, PLM 15 operational. pop ir iota; uuantity and as a percentage of the (b) Bulk samples shall not be composited tor lunciiona space analysis and shall be analyzed for asbestos content : Cnnditior of the material, specifying: by PLM, using the ‘‘interim Method for the Deter­ Il Ts-pe o' damage or significant damage (e.g., mination of Asbestos in Bulk Insulation Samples" f.akifik biistenng, water damage, or other signs of found at appendix E to subpart E of this par.. phisi.a Ca.'napc (c)(1) A homogeneous area is considered not to 111 Sevcnii of damage (e.g.. major flaking, se­ contain ACM only if the results of all samples re­ vere.- lore lacKcts. as opposed to occasional flak­ quired to be collected from the area show asbestos ing truno' lean it- lackets). in amounts of 1 percent or less. UI Bxier' or spread of damage over large areas or .a-g- pe.-ieniages of the homogeneous area. (2) A homogeneous area shall be determined to ■ Whetner int matenai is accessible. contain ACM based on a finding that the results 4 The rnaicnia"s poientiai for disturbance. of at least one sample collected from that area tf Lnowr o- suspected causes of damage or shows that asbestos is present in an amount great­ er than 1 percent. signifiuani camage le g.. air erosion, vandalism, vipratior. waie- (d) The name- and address of each laboratory 10 fTeveniive measures which might eliminaie performing an analysis, the dale of analysis, and me reasonahit likelihood of undamaged ACM the name and signature of the person performing from oecoming Mjr.ificanib aainaged. the analysis shall be submitted to the person des­ id - The local ecucatior agency shall select a ignated under § 763.84 for inclusion inio the man­ person accrcCiied tc develop rnanagement plans to agement plan within 30 days of the analysis. review me result: of each inapccuor.. rcinspcction, (52 PR 4,g45 Ctej 30 1987, „ imended ai 60 FT, and a.ssci.smeni for me schoo, building and to con­ 3’:972, June 19, 1995] duct any other neces-sarv activities in order to rec­ ommend ir, writing to the local education agency §763.88 Assessment. apprnpr.ate response actions The accredited per­ (a)il i For each inspection and reinspection con­ son snail sign anc cate the recommendauon. pro- ducted under §763.85 (at and (c) and previous in­ vioe his or ner State o: accrcdiiauon. and. if appli- spections specified under § 763.99, the local edu­ caoie, prpvioe his or ner accreditation number, and cation agency shall have an accredited inspector subrru: a copy of the recommendation to the per­ provide a written assessment of all friadle known son oesignated unoer § 763.84 for inclusion in the or assumed ACBM in the school building. management plan. (21 Each accredited inspector providing a writ­ ten assessment shall sign and dale the assessment, §763.90 Response actions. provide his or her State of accreditation, and if ap­ (ai The local education agency shall select and plicable. accreditation number, and submit a copy implement in a timely manner the appropriate re­ of the assessment to the person designated under sponse actions tn this section consistent with the

6

CITy_21MC100_006242929

NYC-WTC_000411798

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411798Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →