Project worksheet, PS 89 testing locations, 2002

Machine-extracted title · confidence 37%

Locations and counts of air tests at PS 89 per day and schedule.

NYC-WTC_000411674–000411675
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B No. 3067-0151 PROJECT WORKSHEET - Narrative Expires April 30, 2001 DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA-1391 -DR-NY 061-51000-22 05/06/2002 B APPLICANT COUNTY New York City, Board of Education (BoE) New York

i Indoor Air Monitoring

A total of 9 au-monitoring stations are established throughout the interior of IS 89. A total of 10 tests are conducted per day. i Each test lasts approximately four hours, and samples approximately 1,800 liters of air. The station locations, the number of ( tests conducted, and details of the testing are listed below.

an IE

First floor hallway outside cafeteria 2 One sample from Sam-12pm and one sample from I__ ' Cafeteria 1 12pm-4pm One sample taken during the school day I Gymnasium 1 One sample taken during the school day Auditorium 1 One sample taken during the school day North Classrooms 1 One sample immediately after tlie last class East Classrooms 1 One sample immediately after the last class South Classrooms T One sample immediately after the last class Second floor Hallways south end 1 One sample immediately after the last class Fourth floor Hallways south end 1 One sample immediately after the last class

! Outdoor Air Monitoring

i A total of 3 exterior air-monitoring stations are established on the extenor of IS 89. A total of 6 tests are conducted per day. I Each test lasts approximately four hours, and samples approximately 1,800 liters of air. The station locations, the number of ! tests conducted, and the details of the testing are listed below.

Inside playground, north side 2 One sample from Sam-12pm and one sample from 12pm-4pm Inside playground, south side 2 One sample from 8am-12pm and one sample from 12pm-4pm Fifth floor roof 2 One sample from 8am-12pm and one sample from 12pin-4pni I Total Tests . ,

j ParrnnetersofTesting

Re.sults from the samples collected each day will be reported verbally no later than Sam the next day to the BoE. .A wntten i report will then be submitted by the end of that day that will report the analytical data collected. A plan has been devised in the case that testing results exceed the target levels that are provided below

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007970226 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411674

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411674Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411648

FEMA worksheet detailing air-testing locations and schedule for PS 833.

Similar indexed content

Compare copies and versions →