Project application summary, BOE air monitoring, 2002

Machine-extracted title · confidence 35%

Summary of project cost and scope for BOE air-quality monitoring and eligible costs.

NYC-WTC_000411664
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DATE; 06/02/2003 FED'"'’AL EMERGENCY MANAGEMENT AGEN .OJECT APPLICATION SUMMARY (P.2, DISASTER#: 1391

PACKAGE NO: 89

P.A. ID: 061-51000-22 APPLICANT: NEW YORK / EDUCATION, BOARD OF. EDUCATION, BOARD OF

PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT

826 1 B N N 03/11/2002 $325,194.08 Site Number: 1 DAMAGED AIR / DUST / WATER QUALITY TESTING FACILITY: PS 894-90 TRINITY PLACE, NEW YORK, NY 10006 FACILITY LOCATION; THIS PROJECT WORK SHEET REIMBURSES THE BOE $393,664.68 FOR THE ESTIMATED COSTS TO MONITOR THE INTERIOR AND EXTERIOR AIR QUALITY OF PS 894 FROM JANUARY 21,2002 TO JUNE 30, 2002 (THE END OF THE SCHOOL YEAR). DUE TO THE SCHOOL'S PROXIMITY TO GROUND ZERO, AND THE POTENTIAL FOR SCOPE OF WORK: CONTAMINANTS IN THE DUST GENERATED BY THE DEBRIS REMOVAL EFFORT, THE AIR MONITORING AND ITS ASSOCIATED COSTS ARE CONSIDERED REASONABLE AND ELIGIBLE UNDER SECTION 403 OF THE STAFFORD ACT.

THE BOE CONTRACTED ATC ASSOCIATES TO PERFORM THE WORK, SPECIFICALLY CONDUCTING INDOOR AND OUTDOOR AIR QUALITY TESTING AS WELL AS WATER AND SURFACE CONTAMINATION TESTING. A TOTAL OF 13 AIR MONITORING STATIONS THAT CONDUCTED 14 AMBIENT AIR TESTS PER DAY WERE ESTABLISHED INSIDE THE SCHOOL BUILDING. AN ADDITIONAL 2 AIR MONITORING STATIONS THAT CONDUCTED 4 AMBIENT AIR TESTS PER DAY WERE ESTABLISHED ON THE EXTERIOR OF THE SCHOOL. ADDITIONAL TESTING WAS DONE TO ADDRESS DUST AND WATER CONTAMINATION AS NEEDED. PLEASE SEE THE NARRATIVE FOR THE DETAILS OF WHERE THE AIR TESTING STATIONS WERE LOCATED, HOW MANY TESTS ARE COMPLETED PER DAY AT EACH MONITORING STATION, AND THE PARAMETERS OF THE TESTING. THE BOE HAS NOT BEEN INVOICED FOR ACTUAL COSTS, AND THEREFORE THE DOLLAR AMOUNT IN THIS PW IS BASED ON AN ESTIMATE PROVIDED BY THE APPLICANT'S VENDOR, ATC ASSOCIATES (ATTACHED TO THIS PW).

WORK COMPLETE CONSISTS OF EXPENSES FROM JANUARY 21, 2002 TO APRIL. 22, 2002 BY ATC ASSOCIATES AT PS 894 FOR A COST OF $224,388.87.

WORK TO BE COMPLETED CONSISTS OF EXPENSES FROM APRIL 23, 2002 TO JUNE 30, 2002 (THE END OF THE SCHOOL YEAR) BY ATC ASSOCIATES AT PS 894 FOR A COST OF $169,275.81. ATC WILL CONDUCT THE SAME INTERIOR AND EXTERIOR AIR QUALITY TESTING. AS WELL AS DUST AND WATER TESTING AS DESCRIBED ABOVE DURING THIS TIME PERIOD.”VERSION 1 -

""VERSION 1""

WORK COMPLETE CONSISTED OF THE ACTUAL EXPENSES INCURRED BY THE NEW YORK CITY BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY ATC ASSOCIATES, A CONTR ACTOR TO BOE AT PUBLIC SCHOOL 894 (PS 894, ALSO REFERRED TO AS PS 425) COMMONLY CALLED THE HIGH SCHOOL FOR LEADERSHIP & PUBLIC SERVICES. THE TOTAL ELIGIBLE WORK FROM NOVEMBER 2001 TO SEPTEMBER 2002 IS A COMPILATION OF FOUR PAYMENTS (THAT ARE ATTACHED TO THIS PROJECT WORKSHEET) AND TOTAL $760,100.65. PWS 825 AND 826 WERE BASED ON ESTIMATES AND PROVIDED THE APPLICANT WITH FUNDS TO PERFORM WORK AT PS 894 FROM SEPTEMBER 2001 TO JUNE 2002, TOTALING $433,906.57, LEAVING A DIFFERENCE OF $326,194.08, WHICH IS THE TOTAL ELIGIBLE ADDITIONAL CONTRACT COST FUNDED UNDER THIS PW. THESE ACTUAL INVOICES INCLUDE THE FOLLOWING:

PAYMENT #1 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM NOVEMBER 2001 TO FEBRUARY 2002. AS A RESULT OF A BOE DESK AUDIT, THIS PAYMENT WAS REDUCED FROM $187,768.60 TO $178,858.40. THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #1 WAS $178,858.40.

PAYMENT #8 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM MARCH TO APRIL 2002. THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #8 WAS $291,748.75.

PAYMENT #11 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM MAY TO JUNE 10, 2002. THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #11 WAS $273,171.00

PAYMENT #19 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES TO CONDUCT AIR QUALITY TESTING FROM JULY TO SEPTMEBER 10,2002. THE TOTAL ELIGIBLE COST FOR PAYMEN 1 #19 WAS $16,322 50.

THIS PW FUNDS THE APPLICANT WITH TOTAL ELIGIBLE CONTRACT COSTS OF S326 194.08,

Page 5 of 14

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007970032 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411664

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411664Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411653

Project application summary for PS 833 air quality monitoring costs reimbursement.

Similar indexed content

NYC-WTC_000302276

Project worksheet for air quality monitoring at PS 833, Trinity Place, NYC, related to WTC debris dust mitigation.

Similar indexed content

Compare copies and versions →