FEMA Project Worksheet summary, PS 833 air testing

Machine-extracted title · confidence 68%

Narrative on air and dust testing at PS 833; funding and reimbursement notes.

NYC-WTC_000411651–000411652
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DECLARATION NO; PROJECT NO. FIPS NO, DATE CATEGORY FEMA- 1391 -DR- NY______ 061-51000-22 03/18/03 B DAMAGE FACILITY WORK COMPLETE AS OF: Air Quality Testing 09/10/02 100 % APPLICANT COUNTY New York City, Board of Education New York

NARRATIVE

ATC Associates conducted air and waster testing at downtown schools. At Public School 833 (PS 833, also referred to as PS 489) commonly called the High School of Economics and Finance, between October 2001 and S^emteD2002, air, dust and water testing was completed for asbestos, lead, metals, respirable particulates and 'port^mi^Payments #2, #7, #13 and #22 are additions to Payment #89 for $11,630.00 eligible cost for the PS 833, incurred during October 2001 and funded under PW #1075 - Air Quality Testing for New York City Schools. The BoE Payment No. is included on the upper nght comer of the sheet.

Payment #2 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from January to February 2002, as indicated on payment, for BoE contract 3U75414. ATC Associates' eligible contract work for this invoice was divided in three categories: labor, equipment and testing. ATC Associates labor consisted of 12 technicians and inspectors working 292 hours at a cost of $16,865.00 and 7 employees performing project management totaling 117.5 hours at a cost of $10,005.00. Total labor cost was ^^sted air, dust and water for metals, asbestos, lead, dioxin, PCB, particulate matter and ^erSbmtxJTor a total cost of $56,450.20. Equipment used by ATC included different types of air monitors that were placed around the school, as well as handheld monitors that checked for respirable particulates. The equipment charges are per day, at a total cost of $3,895.00. As a result of a BoE desk audit, the payment of this voucher wa.s reduced from 87,215.20 to £84,085.20. The total eligible contract cost for Payment #2 was $84,085.20

Payment #7 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from March to April 2002, as indicated on payment, for BoE contract 3E75253. ATC Associates' eligible contract work for this invoice was divided in three categories: labor, equipment and testing. ATC Associates labor consisted of 2 employees performing administrative work totaling 25.25 hours at a cost of $883.75, 16 technician.s and inspectors working 1165.5 hours at a cost of $66,410.00 and 7 employees performing project management totaling 113 hours at a cost of $10,630.00. Total labor cost was S^92W5^TC tested air, dust and water for metals, asbestos, lead, dioxin, PCB, particulate matter and a total cost of $194,203.50. ATC performed a very large number of asbestos and metal tests that increased analytical costs substantially at this period. Equipment used by ATC included different types of air monitors that were placed around the school, as well as handheld monitors that checked for respirable particulates. The equipment charges are per day, at a total cost of $7,690.00. The total eligible contract cost for Payment #7 was $279,817.25.

Payment # 13 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from May to June 2002, as indicated on payment, for BoE contract 3E75253. ATC Associates' eligible contract work for this invoice was divided in three categories: labor, equipment and testing. ATC Associates labor consisted of 1 employee performing administrative work totaling 25 hours at a cost of $875.00, 13 technicians and inspectors working 1179.5 hours at a cost of $67,477.50 and 6 employees performing project management totaling 191.25 hours at a cost of $14,942.50. Total labor cost was $83,295.00. .ATC tested air and dust for metals, asbestos, lead, dioxin, PCB and particulate matter, for a total cost of $168,105.00. ATC performed a very large number of asbestos and metal tests that increased analytical costs substantially at this period. Equipment used by ATC included different types of air monitors that were placed around the school, as well as handheld monitors that checked for respirable particulates. The equipment charges are per day, at a total cost of $8,040.00. The total eligible contract cost for Payment #13 was $259,440.00.

Payment #22 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from July to October, 2002, as indicated on payment, for BoE contract 3E75253. Although the invoice goes through October 2002, actual work for this period was complete as of September 10, 2002. ATC

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007969876

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411651

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411651Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →