NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

FEMA Project Worksheet, PS 833 air testing

Machine-extracted title · confidence 66%

FEMA project worksheet for PS 833 air monitoring, March–June 2002.

NYC-WTC_000411646
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDER.AL E.MERGENCY MANAGEMENT AGENCY O.M.B No. 3067-0151 PROJECT WORKSHEET-Narrative Expu-es April 30, 2001 DECLARATION NO: PROJECT NO. FIPS NO, 1 DATE CATEGORY FEMA-I391 -DR-NY 061-51000-22 i 04/29/02 B APPLICANT COUNTY New York City, Board of Education (BoE) New York

Indoor Air Monitoring

.A total of 10 air-monitoring stations are established throughout the interior of PS 833. A total of 11 tests are conducted per ! day. Each test lasts approximately four hours, and samples approximately l,S00 liters of air. The station locations, the I number of tests conducted, and details of the testing are listed below.

Location of the Air Testing Station Number of Samples Details ' per day___________ < 1., 1 . , ? > •. , ■

First floor lobby outside the 2 One sample from Sam-12pm and one sample from auditorium 12pm-4pm Cafeteria 1 One sample taken during the school day Auditorium I One sample taken during the school day____________ Classrooms on the 4“' Floor 1 One sample immediately after the last class _______ Classrooms on the 6“ Floor 1 One sample taken immediately after the last class Classrooms on the S'* Floor 1 One sample taken immediately after the last class Third Floor Hallway_______________ 1 One sample taken immediately after the last class Fifth Floor Hallway________________ 1 One sample taken immediately after the last class Seventh Floor Hallway_____________ 1 One sample taken immediately after the last class Ninth Floor Hallway _________ 1 One sample taken immediately after the last class TotalTests . F . > 'Y*: , • ‘Y • MT

Outdoor Air Monitoring

A total of 3 exterior air-monitoring stations are established on the exterior of PS 833. A total of 6 tests are conducted pet day. Each test lasts approximately four hours, and samples approximately 1,800 liters of air. The station locations, the number of tests conducted, and the details of the testing are listed below.

I Location of the Air Testing Station ’ Number of Samples Details perday ' ; Outside by main entrance 2 One sample from Sam-12pm and one sample from

Stair case B (open stair case) T'* Floor 7 12pm-4pm One sample from Sam-12pm and one sample from ii landing 12pm-4pm Roof One sample from 8am-I2pm and one sample from 12pm-4pm j I Total Tests H 6

\ Parameters of Testing

I Results from the samples collected each day will be reported verbally no later than Sam the next day to the BoE. A written f report will then be submitted by the end of that day that will report the analytical data collected. A plan has been devised in 1 j the case that testing results exceed the target levels that are provided below.

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007969841

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411646

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411646Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411648

FEMA worksheet detailing air-testing locations and schedule for PS 833.

Similar indexed content

Compare copies and versions →