NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

FEMA Project Worksheet summary, PS 234 site

Machine-extracted title · confidence 60%

FEMA project summary for PS 234 site mitigation and cost reimbursement.

NYC-WTC_000411638–000411640
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DATE: 07/15/2002 FEC iL EMERGENCY MANAGEMENT AGEh PROJECT APPLICATION SUMMARY (P.2) DISASTER#: 1391

PACKAGE NO: 45

P.A, ID: 061-51000-22 APPLICANT: NEW YORK / EDUCATION. BOARD OF. EDUCATION. BOARD OF PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT

558 0 E N N 03/11/2003 $1,513,237.57 Site Number: 1 DAMAGED FACILITY: STUYVESANT HIGH SCHOOL CLEAN UP

FACILITY LOCATION: 345 CHAMBERS STREET, NEW YORK, NY 10282

SCOP= OF WORK' WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED BY THE NEW YORK CITY, BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL WORK FOR REMEDIATION AND RESTORATION OF STUYVESANT HIGH SCHOOL ON THE BASIS OF DESIGN CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO THE DISASTER AND IN CONFORMITY WITH APPLICABLE STANDARDS

SCA WAS RESPONSIBLE FOR COORDINATION AND CONSTRUCTION MANAGEMENT OF THE CONTRACTORS PERFORMING WORK AT STUYVESANT HIGH SCHOOL. COSTS ASSOCIATED WITH THE WORK PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($6,414,64), INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE BENEFIT RATE FOR NONUNIFORM EMPLOYEES OF 44.66% ($2,864.78). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS $9,279 42. COSTS ASSOCIATED WITH OVERTIME LABOR FOR SCA ($19,568.44), INCLUDING THE NEW YORK CITY OVERTIME FRINGE BENEFIT RATE FOR NONUNIFORM EMPLOYEES OF 10.73% ($2,099.70) TOTA INCURRED COST FOR OVERTIME LABOR IS $21,688.24,

CONTRACTUAL WORK COMPLETE CONSISTS OF WORK PERFORMED BY FOUR CONTRACTORS TO CLEAN THE FACILITY OF DUST AND DEBRIS, IN ACCORDANCE WITH ENVIRONMENTAL REGULATIONS DETAILED IN THE NARRATIVE, TRIO ASBESTOS REMOVAL CORPORATION (TRIO) PERFORMED CLEANUP AND REMEDIATION OF DUST AND DEBRIS ON THE FIRST, SECOND, THIRD, NINTH, TENTH, AND THE 11TH (MECHANICAL ROOM) FLOORS AS WELL AS THE ROOF LEVEL, SWIMMING POOL, AUDITORIUM AND BASEMENT. TAYLOR ENVIRONMENTAL (TAYLOR) WAS RETAINED TO CONDUCT ASBESTOS PROJECT MONITORING, AIR SAMPLING AND ON SITE ANALYTICAL SERVICES. ATC ASSOCIATES (ATC) CONDUCTED ADDITIONAL SAMPLING FOR AIR QUALITY CONTROL IN COORDINATION WITH THE REMEDIATION PROJECT PERFORMED AT STUYVESANT HIGH SCHOOL CORINTHIAN CONSTRUCTION (CORINTHIAN) REMOVED ALL GRAVEL AND INSULATION FROM THE ROOF THAT WAS IMPACTED WITH DUST AND DEBRIS. THE ROOF MEMBRANE WAS WASHED THOROUGHLY AND NEW GRAVE WAS LAID. TDX/BECOM PERFORMED POWER WASHING AND CLEANING OF THE EXTERIOR OF STUYVESANT HIGH SCHOOL. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM SCA FOR THIS PROJECT WORKSHEET IS $1,485,290.01

^EE NARRAWE^F^OR DETAILE^D^DESCRIPTION OF THE WORK PERFORMED BY SCA AND EACH CONTRACTOR, AS

TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,516,237,57,

Page 8 of 12

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007969786

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411639

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411639Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

FEMA application summary, 1391

NYC-WTC_000279710

Project application summary for FEMA disaster 1391; reveals site and cost figures.

Similar indexed content

Compare copies and versions →