NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
6 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗FEMA project summary for PS 234 school cleanup at 292 Greenwich Street.
NYC-WTC_000243511–000243513OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DATE: 07/15/2002 FED \L EMERGENCY MANAGEMENT AGEN PROJECT APPLICATION SUMMARY (P.2) DISASTER#: 1391
PACKAGE NO: 4E
P.A ID. 061-51000-22 APPLICANT. NEW YORK / EDUCATION, BOARD OF, EDUCATION, BOARD OF PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT
55S 0 E N N 03/11/2003 $1,515,237.57 Site Number: 1 DAMAGED FACILITY: STUYVESANT HIGH SCHOOL CLEAN UP
FACILITY LOCATION: 345 CHAMBERS STREET, NEW YORK, NY 10282
SCOPE OF WORK WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED BY THE NEW YORK CITY, BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL WORK FOR REMEDIATION AND RESTORATION OF STUYVESANT HIGH SCHOOL ON THE BASIS OF DESIGN CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO THE DISASTER AND IN CONFORMITY WITH APPLICABLE STANDARDS
SCA WAS RESPONSIBLE FOR COORDINATION AND CONSTRUCTION MANAGEMENT OF THE CONTRACTORS PERFORMING WORK AT STUYVESANT HIGH SCHOOL. COSTS ASSOCIATED WITH THE WORK PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($6,414,64), INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE BENEFIT RATE FOR NONUNIFORM EMPLOYEES OF 44.66% ($2,864.78). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS $9,279.42. COSTS ASSOCIATED WITH OVERTIME LABOR FOR SCA ($19,568.44), INCLUDING THE NEW YORK CITY OVERTIME FRINGE BENEFIT RATE FOR NONUNIFORM EMPLOYEES OF 10.73% ($2,099.70). TOTA INCURRED COST FOR OVERTIME LABOR IS $21,688.24.
CONTRACTUAL WORK COMPLETE CONSISTS OF WORK PERFORMED BY FOUR CONTRACTORS TO CLEAN THE FACILITY OF DUST AND DEBRIS, IN ACCORDANCE WITH ENVIRONMENTAL REGULATIONS DETAILED IN THE NARRATIVE. TRIO ASBESTOS REMOVAL CORPORATION (TRIO) PERFORMED CLEANUP AND REMEDIATION OF DUST ANU DEBRIS ON THE FIRST, SECOND, THIRD, NINTH, TENTH, AND THE 11TH (MECHANICAL ROOM) FLOORS AS WELL AS THE ROOF LEVEL, SWIMMING POOL, AUDITORIUM AND BASEMENT, TAYLOR ENVIRONMENTAL (TAYLOR) WAS RETAINED TO CONDUCT ASBESTOS PROJECT MONITORING, AIR SAMPLING ANO ON SITE ANALYTICAL SERVICES, ATC ASSOCIATES (ATC) CONDUCTED ADDITIONAL SAMPLING FOR AIR QUALITY CONTROL IN COORDINATION WITH THE REMEDIATION PROJECT PERFORMED AT STUYVESANT HIGH SCHOOL CORINTHIAN CONSTRUCTION (CORINTHIAN) REMOVED ALL GRAVEL AND INSULATION FROM THE ROOF THAT WAS IMPACTED WITH DUST AND DEBRIS. THE ROOF MEMBRANE WAS WASHED THOROUGHLY AND NEW GRAVE WAS LAID. TDX/BECOM PERFORMED POWER WASHING AND CLEANING OF THE EXTERIOR OF STUYVESANT HIGH SCHOOL. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM SCA FOR THIS PROJECT WORKSHEET IS $1,485,290.01
SEE NARRATIVE FOR DETAILED DESCRIPTION OF THE WORK PERFORMED BY SCA AND EACH CONTRACTOR AS WELL AS THEIR RESPECTIVE COSTS,
TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,516,237.57.
Page 8 of 12
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_008628576
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000243512
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
6 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
5 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411644
FEMA project worksheet for PS 89 remediation under disaster 1391.
4 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
6 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
6 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411645
FEMA/BOE cost summary for BOE project at 201 Warren Street, including remediation and restoration expenses.
4 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243514
Summary of FEMA disaster costs for PS 234 school cleanup project.
6 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263574
Emergency management project summary for BOE facility at 201 Warren Street.
4 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
4 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267441
FEMA disaster project data for New York City Education Board site remediation and SCA work.
6 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
6 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267441
FEMA disaster project data for New York City Education Board site remediation and SCA work.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
Similarity score 0.972 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
FEMA project summary for PS 234 site mitigation and cost reimbursement.
Similar indexed content
NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
Similar indexed content
NYC-WTC_000263574
Emergency management project summary for BOE facility at 201 Warren Street.
Similar indexed content
NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similar indexed content
NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
Similar indexed content