provided. However, TA’s analysis of worker licensure in comparison with
Safeway’s payroll revealed that some licenses were missing. TA’s pursuit of this
issqe led to a concern associated with wage rates for workers who, according to
SafeXav. performed functions^ch as truck driver and warehouse attendant. This
aspect oTqur analysis is addressed in a separate section of this report. X
Waste Disposal \ \
The submitted documentation indicates tmt Safeway contracted the services Qf
six (6) entities to provide waste containers, 'transportation and disposal of waste
generated by the project and handled by Safeway. The following sub-contractors
utilized by Safeway on the project were identifiei^ the submittals;
Asbestos Asbbstos Transportation Co., In®,, Hampton Bays, NY
Metal Debris Waldorf Carting Corp., Mount V^non, NY
Mold & Asbestos Strong Equipment, Staten Island, Nrk
Sub to Strong Equip. Hi Tech Tarans LLC, Newark, NJ ’
Sub to Strong Equip. Cooper Tarik Transfer - Brooklyn, NY
Sub to^Strong Equip. lESI Corporation - Bayoime, NJ
Sub to Strong Equip. lESI Varrick S^e^t, NY
Sub to Strong Equip. lESI Brooklyn, NY
TA reviewed rhe waste manifests with 'emphasis on the waste hauler’s
responsibility to properly document various waste transport points and disposal.
The analysis included the type of waste, disposal^pntractor’s credentials, type of
waste generated at the site, waste pickup points, transfer stations and destination,
chain of custody recb'rds inclusive of dates, signatures, waste volume and/or
weight, etc. \
TA\reconimends the of payments invoiced for^x all of the above
cotitiXlors with the exceptioXpf Asbestos Transportation Co., lnc. due to the
lack of' critical information depicting the integrity of the waste disposal.
InformationHacking in the documentation provided includes waste pick-up point,
waste destination, driver names, waste generator’s names, signatures and dates.
(Exhibit 1)
Billing Analysis
1. Asbestos Abatement/Demolition Invoices
Labor
Review of invoices revealed numerous issues pertaining to payroll. Due to the
extent of personnel employed on the project, the amount of corrections made to
the payroll and lack of a credible, clear trail supporting said changes, only a
sample time frame (from June 2, 2002, through June 30, 2002) was examined.
TA’s review of the sample time frame revealed that the invoices lacked adequate
12
07.002350
CONFIDENTIAL INSURANCE INFORMATION, CITY_2IMCl00_003492486