NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Night final daily workforce report for World Trade Center site, December 9, 2001.
NYC-WTC_000408098OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone', N.Y. 11357-(718) 767-9000 DATE; SUNDAY 12/9/01 NIGHT FINAL
DAILY WORK FORCE REPORT 1 _______ I________ Job Name & Locatloni World Trade Center Contract No, I Weather Conditions CLEAR & COOL
Labor •I Equipment CLASSIFICATION QUANT? I Description MANNED STANDBY IDLE SUPERINTENDENT j 2 CAT 966 LOADER 1 PROJECT ENGINEER i CAT 446 BACKHOE 1 OFFICE ENGINEER ; CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15________;______________ 6 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS i 7 TOOLVAN ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 365 & 750 DOWN BELOW LOADING EUKES & FLATS WELDING TRUCK FUELTRUCK 1 1200 & 375 ON SLOPE FEEDING DEBRIS TO PICKUP TRUCKS 3 OUR TRUCKS LIGHT TOWERS 13 SITE MULE 3 CLEANED OUT CHILLER OUTFALL_____________ DUMP TRUCKS BURNED REMAINING COLUMNS IN NORTH WALL 10 WHEEL DUMP TRUCK 54 LOADS OUT (TOP) FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 ■
43 EUKES OUT (BELOW) CARGO BOXES 3 4 FLATS OUT (BELOW) FLAT TRUCK PUMP 2 ■ ROLLER ■ RAINMAKER/GENIE LIFT 1
Description of Work: _______________________________________________________ ________________________ WORK PERFORMED. LOAD OUT STEEL AND DEBRIS MAN TARPING AND TRIMMING STATIONS______________________________________________________________ MAINTAIN TRAFFIC FLOW IN ANO OUT OF AREA_____________________________________ __________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS______________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253
GRACE CONTRACTING CORP Approved By: Title; For: SUPeraNTENDENT '
DAILY WORK FORCE REPORT1209N.xls 02.200080
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC1OO_OO2758175
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000408098
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419107
Night shift workforce and equipment listing for World Trade Center, Dec 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408093
Daily workforce and equipment details for World Trade Center site, December 12, 2001 (Day).
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429740
Daily labor and equipment classifications for World Trade Center project, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305603
Day final daily workforce and equipment at World Trade Center site, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305600
Final night daily workforce and equipment at World Trade Center site, December 2001.
1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305238
Night shift daily workforce report detailing personnel, classification, and equipment at World Trade Center job.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263653
Day preliminary daily workforce report for World Trade Center project (2/2/02).
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305602
Night final daily workforce and equipment at World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419107
Night shift workforce and equipment listing for World Trade Center, Dec 9, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408093
Daily workforce and equipment details for World Trade Center site, December 12, 2001 (Day).
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429740
Daily labor and equipment classifications for World Trade Center project, Dec 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
Similar indexed content
NYC-WTC_000419107
Night shift workforce and equipment listing for World Trade Center, Dec 9, 2001.
Similar indexed content
NYC-WTC_000408093
Daily workforce and equipment details for World Trade Center site, December 12, 2001 (Day).
Similar indexed content
NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
Similar indexed content
NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
Similar indexed content