NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, Grace Contracting, World Trade, Dec 14,

Machine-extracted title · confidence 33%

Night final daily workforce and equipment roster for World Trade, Dec 14, 2001.

NYC-WTC_000408088
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

' I I

GRACE CONTRACTiNG CORP. 15M56lhRdad, Whitestond, N.Z. 11357-(718>767-9000 DATE; DECEMBER 14, 2001 (NIGHT FINAL) S

! DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor. ___________ Equipment CLASSIFICATION QUANT, Description MANNED STANDBY IDLE SUPERINTENDENT I 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER i CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 13 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER .1 . LOCAL 14_______ 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER ; 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES; HIGH DECK TRAILERS WELDING TRUCK FUELTRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 4 ■ FLAT TRUCK 1 ■ PUMP 2 ’ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work:

MANNED TARPING AND TRIMMING STATIONS_________________________________ MANNED WATER STATIONS FOR DUST CONTROL_____________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_______________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2______________ ELEVATIONS; ALL MACHINES LEVEL B-5 253 ___________________________ EXCAVATION: TULLY-26 FLATBED & 3B EUCLID LOADS OUT. BOVIS-25 LOADS OUT AMEC- 65 LOADS.

GRACE CONTRACTING CORP Approved By: Title: BY: For; SUPERINTENDENT

DAILY WORK FORCE REPORT 1214N.xls .02.2C007Q

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_002758165

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000408088

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408088Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →