Daily work force report, World Trade Center, Nov 29, 2001

Machine-extracted title · confidence 28%

Final daily labor/equipment report for World Trade Center, Nov 29, 2001.

NYC-WTC_000408079
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^■GRACE CONTRACTING CORP. V 151-45 6fh Road, Whitestone, N.Y. 113SZ-(718) 767-9000 DATE: NOVEMBER 29. 2001 (DAY) FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANTIT _______ Description : MANNED STANDBY IDLU SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT446 BACKHOE 1 [OFFICE ENGINEER CAT 973 LOADER________ 1 'FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER 1 CAT 575 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER ' 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 G/W OPER LOCAL 15 9 HITACHI i200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 2 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 6 TOOL VAN ' 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 9 2.5 HOURS SITE MULE___________ 3 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO boxes 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIELIFT 1 a=: Description Of Work; PRELIMINARY/ANTICIPATED WORK ______________________________ ___________ CONTINUE TO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC. MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL______________________________ ________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 BEGIN BURNING THE NORTH WALL COLUMNS LOADS OUT 104 “

GRACE CONTRACTING Ci Approved By. Title: For: SUPERINTENDENT

02J00061

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_002758156

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000408079

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408079Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →