NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade site, Nov 2001

Machine-extracted title · confidence 35%

Daily workforce and equipment counts for World Trade Center site, Nov 2001.

NYC-WTC_000408056
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 161-45 6!h Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; NOVEMBER 13, 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor I Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 445 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 [LABORERS___________ 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1* CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS 13 TOOL TRUCK MECHANICS 1 ■ TOOL VAN HOUSE WRECKERS 10 ROLL OFF DUMP TRAILERS 9 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER i 1 TUBE TRAILER 3 FLAT TRUCK 1 ■ PUMP 1 1 ■ ANGEL AERIAL (DUST SUPR 1 ■ 85' GENIE 1

Description of Work:_________________________________________ LOADS OUT: 101__________________ _____________________________ MAN TARPING AND TRIMMING STATIONS__________________________ MAN WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA____________________ CONTINUE REMOVING DEBRIS TOWER 2 DELAY: 1200 AND 375 STOPPED BY FDNY FOR 1 HOUR FOR RECOVERY ‘NOTE; 1200 GRAPPLER BROKE TOOTH ON GRAPPLE AT 12 MIDNIGHT

GRACE CONTR,ACJ(NG^ORP Approved By: Title; BY: 7 For: SUPERINTENDENT

02J00010

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_002758125

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000408056

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408056Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Daily work force report

NYC-WTC_000388176

Night shift daily workforce/equipment log for World Trade site, Nov 13, 2001.

Similar indexed content

Compare copies and versions →