NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily workforce report, World Trade Center, Nov 0, 2001

Machine-extracted title · confidence 42%

Day shift workforce and equipment at World Trade Center site, Nov 0, 2001.

NYC-WTC_000408030
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 11-45 6th Road, Whilestone, N.Y. 11357-(710)767-3000 DATE; NOVEMBER 0, 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

Job Nams & Location; World Trade Center Contract No. Weather Conditions

Labor I Equipment OWNED RENTED I I CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 GRACE I PROJECT ENGINEER 2 CAT 446 BACKHOE 1 GRACE OFFICE ENGINEER 1 CAT 973 LOADER |‘ ■1 GRACE FOREMEN 1 CAT 365 6RAPPLER : 1 HO PENN SAFETY OFFICER 1 CAT 375 GRAPPLER 1 HO PENN LABORERS 22 HITACHI 75Q GRAPPLER 1 DYNAMIC IRON WORKERS 1 HITACHI 550 GRAPPLER 1 1 DYNAMIC LOCAL 14 S HITACHI 550 GRAPPLER 1 DYNAMIC LOCAL 15_____________ 8 HITACH11200 GRAPPLER 1 DYNAMIC CARPENTER COMPRESSION TRUCK CARPENTER FOREMAN _3_ MECHANICS TRUCK 2 TEAMSTERS__________ 15 TOOL TRUCK 2 MECHANICS 2 TOOLVAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 11 LOW BED TRAILER HIGH DECK TRAILERS 3 ' WELDING TRUCK 1 FUELTRUCK 1 ■ PICKUP TRUCKS 5 LIGHT TOWERS 8 ■ PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 ■ OFFICE TRAILER 1 TUBE TRAILER 3 FLAT TRUCK ■ 185 CFM COMPRESSOR 1 DYNAMIC ■ PUMP 1

Description of Work: ___________________ LOADS OUT: 92_________________________________________________ I MAN TARPING AND TRIMMING STATIONS__________________________ MAN WATER STATIONS FOR DUST CONTROL______________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM TOWER 2____________________ DELAY: TWO 550s HAD FRESH AIR SYSTEMS INSTALLED____________ DELAY: ONE MAN AND TRUCK USED 4 HOURS, UNMANNED 8 HOURS

GRACE CONTRACTiNG^COTtP^ -Approved By: Title: For; SUPERIHTENDENT

CONFIDENTIAL, CITY_2IMCl0 0_0 0214915 5 SUBJECT TO PROTECTIVE ORDER NO, 2, SEPT. 2008 NYC-WTC_000408030

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408030Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →