NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 38%

Final daily workforce and equipment summary for World Trade Center site, Dec 27, 2001.

NYC-WTC_000407943
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

jM-

GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; TUESDAY 12/27/01 DAY (FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor ][ Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 IICAT 966 LOADER 1 PROJECT ENGINEER 1 ICAT 446 BACKHOE ~ 1 OFFICE ENGINEER I CAT 973 LOADER ~ 1 FOREMEN CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT375GRAPPLER 2 LABORERS 25 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 8 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES; AWISCO HIGH DECK TRAILERS BLACK BEAR WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK ~ FLASHING ARROW BOARD' 1 OFFICE TRAILER/GENER~ 1 CARGO BOXES ~ 4 [flat truck ~ 1 [pump 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:________________________________________________________________________________ ANTICIPATED WORK____________________ ___________________ ______________________________________ MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MANNED WATERING STATIONS FOR DUST CONTROL LEVELS B-5, EL 253 LOADS OUT; 114 YUKES OUT: 218

GRACE CONTRACTING (CORP Approved By: Title: -BV: / For; SUPERINTENDENT zz DAILY WORK FORCE REPORT1227D.xls ■

CITY_21MC100_013491692 NYC-WTC_000407943

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000407943Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →