Daily work force report, World Trade Center

Machine-extracted title · confidence 25%

Daily workforce and equipment listing for World Trade Center site.

NYC-WTC_000407887
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 Sih Road. Whitestone. N.Y. 11357- (718) 767-9000 DATE: 1-7-02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description [MANNED STANDBY IDLE [SUPERINTENDENT 1 IICAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER I CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 BUCKET 1 LABORERS 21 CAT 375 GRAPPLER 1 [IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 3 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES:__________________________________ HIGH DECK TRAILERS GREAT BEAR - 8 FIVE GALLON BOTTLES OF WATER WELDING TRUCK 1 AWISCO - 24 REFLECTIVE SAFETY VESTS FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW SOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 RAINMAKER/GENIE LIFT 1

Description of Work:____________________________________________________________________________ COMPLETED WORK___________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA _____________________________________________ MAN WATERING STATIONS FOR DUST CONTROL_________________________________________________ LOADS OUT: 142___________________________________________________ ____________________ EUKES OUT: 226

GRACE CONTRACTING CORP| Approved By: BY: Title:_______ For: SUPERINTEND^

DAILY WORK FORCE REPORT0107D.XLT

CITY_21MC100_011874097

NYC-WTC_000407887

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000407887Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237643

Day shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 9, 2002.

Similar indexed content

Compare copies and versions →