Environmental monitoring draft for WTC collapse exposure, NYC

Machine-extracted title · confidence 44%

Draft NYC EH monitoring document on exposure to fibers after WTC collapse.

NYC-WTC_000407762–000407795
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

clearance samples may be collected, or alternatively, the pre-activity sample may be analyzed. In this case, the residence will be considered suitable for re-habitation if the final clearance sample does not have a fiber concentration higher than the pre-activity sample.

The following tables provides an example schedule summarizing the that will be collected for this scenario:

Work area Main living area Time Period Example Clock time Type Min Vol (L) Type Min Vol (L)

Pre-sampling 8:00AM-l 1:00AM Fixed 1200 Fixed 1200 Simulated restoration ll:00AM-12:00PM Personal 14 Fixed 400 Post activity 1 12:00PM-3:00PM Fixed 1200 Fixed 1200 Post activity 2 3:00PM-6:00PM Fixed 1200 Fixed 1200 Post Activity 3 6:00 PM-9:00 PM Fixed 1200 Fixed 1200

Dusi Monitors

In addition to sampling for asbestos, two real-time aerosol monitors will be used to quantify the level of dust particles in the air before, during, and after the simulated restoration activities. One aerosol monitor will be located in close proximity to the stationary air monitor, and the other will be located in the enclosed area where the simulated restoration is occurring.

Bulk Dust

In all locations where simulated restoration activities are performed, samples of the bulk dust will be collected and analyzed for asbestos in accordance with NIOSH Method 9002, or using improved methods currently being developed by USEPA for use on this project.

Scenario 4: Sampling During Exterior Cleanup Activities

Sites will be selected for inclusion in this test scenario based on the results of previous solid media and ambient air sampling results. One area will be selected where debris and/or dust does not contain visible fiber and where PLM and/or Infrared analyses do not reveal the presence of asbestos material. Two areas will be selected where fibrous dust or debris is visible and/or where PLM analysis reveals the presence of asbestos fibers. Sampling will be performed when weather is drier (and hence more likely to release dust and fibers). In addition. Project managers may direct that a second (optional) sample be collected in wet weather by way of comparison. In order to help reduce variability between sites, the same cleanup or remediation tasks will be used at all locations (with appropriate decontamination between locations). Because of the possibility that outside restoration activities might lead to increased exposure to

NYC-WTC_000407779

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000407779Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →