NYC-WTC_000362715
Chain-of-custody documenting pre-bid and monitoring requirements for WTC-LBA project.
13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Pre-bid conference notice and background for asbestos abatement at 114 Liberty Street.
NYC-WTC_000407465–000407470OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Dsm shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within 7 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
6 of 6
CITY_DEP_WORBY_CANNATA_SUBP_000030766
NYC-WTC_000407470
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000362715
Chain-of-custody documenting pre-bid and monitoring requirements for WTC-LBA project.
13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362696
Chain-of-custody document detailing asbestos abatement scope and on-site monitoring plan for 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209413
Statement of work describing requirements for environmental sampling and air monitoring during interior cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407471
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362684
Document detailing scope of asbestos-related air monitoring and site personnel requirements.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362709
Chain-of-custody describing scope of asbestos monitoring and interior cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407447
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407459
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407453
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000195796
Document outlining requirements for a pre-bid conference regarding asbestos abatement and air monitoring at a World Trade Center facility.
12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155453
Discussion regarding corrections to asbestos sampling flow rate language in the 114 Liberty Street work plan.
13 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155617
Distribution of revised draft scopes of work documents for the 114 Liberty Street project.
13 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000362715
Chain-of-custody documenting pre-bid and monitoring requirements for WTC-LBA project.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162860
Revised scopes of work documents for 114 Liberty Street project.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155443
Request to verify sampling methodologies and detection limits in the 114 Liberty Street monitoring specifications.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155635
Submission of contract changes to scope documents awaiting final approval and bidder lists.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342494
Chain-of-custody form for asbestos-related dust sampling at 114 Liberty Street, WTC site, facility-wide.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000362715
Chain-of-custody documenting pre-bid and monitoring requirements for WTC-LBA project.
Similar indexed content
NYC-WTC_000362696
Chain-of-custody document detailing asbestos abatement scope and on-site monitoring plan for 114 Liberty Street.
Similar indexed content
NYC-WTC_000209413
Statement of work describing requirements for environmental sampling and air monitoring during interior cleaning at 114 Liberty Street.
Similar indexed content
NYC-WTC_000407471
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
Similar indexed content
NYC-WTC_000362684
Document detailing scope of asbestos-related air monitoring and site personnel requirements.
Similar indexed content