NYC-WTC_000188105
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
4 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗Draft bid and scope-related correspondence for World Trade Center project; includes sealed bid process note.
NYC-WTC_000407361–000407369OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Results must be reported to EPA and NJDEP within 24 hours of receipt using the spreadsheet provided by EPA.
Personal Protective Equipment - All staff working with WTC scrap, including cutters and crane operators must wear appropriate PPE. Cutters must wear a full or partial face respirator with cartridges designed to reduce asbestos exposure at all times.
Wetting of Steel Beams. Best efforts must be used to ensure that steel beams which are significantly covered with SOF and which could not be processed without disturbing the SOF must be segregated and wetted with a light mist during all phases of the handling operations which might cause SOF to become dislodged and airborne. This includes unloading from and loading of barges as well as during transportation to and from cutting operations.
Segregation and Sampling of SOF Coated Steel Beams. Beams which contain SOF which is green in color and/or beams which are significantly covered with SOF and which could not be processed without disturbing the SOF are segregated from other beams. These beams should be marked and sampled individually. Beams which are found to be coated with SOF which contains > 1% asbestos must be handled in accordance with the federal asbestos regulations at 40CFR Part 61.145, subpart M as applicable to demolition and renovation and in accordance with the NJDEP BMPs below.
The following procedures from 40 CFR Part 61, subpart M, must be adhered to when handling asbestos-containing SOF. Any SOF exposed during cutting or disjoining operations must be wetted. During removal of SOF, the SOF must be wetted sufficiently to render it not friable and there must be no visible emissions as the SOF is removed. SOF must be sealed into leak tight containers while it remains wet as specified in the preceding sentence.
SOF Debris on Ground at Recycling Facilities. At end of processing in a specific area, SOF which collects around the facility must be collected, sampled and, depending on whether it is found to contain > 1% asbestos, should be disposed of as either solid waste (all samples showing less than 1% asbestos) or asbestos containing material in accordance with federal regulations at 40 CFR 61.145 (at any sample showing 1% or > 1% asbestos content).
AMEC STEEL BID ADDENDUM 4 CORRECTED 2 01/08/02
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_008629516 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000407368
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000188105
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
4 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356836
List of marine surveyors for draft surveys related to WTC scrap bids.
5 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388741
Addendum to AMEC steel bid; references for WTC project materials and dates.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322394
Addendum for steel bid with NYC project code references.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269326
Bid addendum for WTC steel, dated 12/3/01, associated with AMEC and NYC project 211909.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386535
Addendum for steel bid related to World Trade Center project, NYC DoD.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000188096
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322488
Addendum document for AMEC steel bid related to World Trade Center project.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339435
Addendum covering steel bid details and adherence guidelines for steel recycling.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356804
Addendum for steel bid; NYC WTC recovery project reference.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267194
Addendum to AMEC steel bid for NYC WTC; bid details and document identifiers.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000235110
Addendum #4 to the World Trade Center steel bid dated December 3-5, 2001.
3 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000268839
Guidance and sampling plan for asbestos in spray-on fireproofing on WTC steel, including weekly sampling and analysis requirements.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267175
Addendum for steel bid and asbestos handling for WTC project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339441
Corrected addendum on SOF handling and weekly sampling requirements.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322494
Corr/notes on sampling of spray-on fireproofing and worker monitoring per NY guidelines.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322569
Addendum discussing sampling requirements for spray-on fireproofing on WTC steel.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388765
Addendum/guide on sampling SOF in WTC steel and EPA/NJDEP oversight.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
Similar indexed content
NYC-WTC_000356836
List of marine surveyors for draft surveys related to WTC scrap bids.
Similar indexed content
NYC-WTC_000388741
Addendum to AMEC steel bid; references for WTC project materials and dates.
Similar indexed content
Addendum for steel bid with NYC project code references.
Similar indexed content
NYC-WTC_000269326
Bid addendum for WTC steel, dated 12/3/01, associated with AMEC and NYC project 211909.
Similar indexed content