NYC-WTC_000188105
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
4 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗Draft bid and scope-related correspondence for World Trade Center project; includes sealed bid process note.
NYC-WTC_000407361–000407369OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
WTC STEEL BID ADDENDUM # 4 CORRECTED 12/3/01
Best Management Practices (for Recyclers in NJ) for Handling WTC Steel Which May Contain Asbestos in Spray-on Fireproofing (SOF)
NY DOL and NYC EPA have their own set of guidelines that must be adhered to by successful bidders in NY State and/or NY City. Sampling of SOF Adhering to WTC Steel. Representative samples must be collected on a weekly basis from each recycler who has received WTC scrap in the previous week. Sufficient samples should be collected each week such that a minimum of 5-10% of new SOF arriving at each facility is sampled. No more than one sample should be taken from each steel memiber tested. Samples should be analyzed using the method cited in 40 CFR 763 Appendix E, Subpart E, Section 1, as is currently being used.
EPA and NJDEP/NJDOH reserve the right to oversee sampling operations or to conduct simultaneous sampling to ensure representative sampling. Sample results must be transmitted to EPA and NJDEP electronically within 24 hours of receipt in a spreadsheet format provided by EPA.
Personal Air Monitoring of Workers. Samples are to be collected and analyzed on a weekly basis from at least 10% of workers. Samples sould be taken from workers who are scheduled to work at least 6 hours with WTC scrap on the day of sampling. Whenever possible, samples are to be taken from workers with the greatest number of hours of exposure on the sampling day. In very dusty conditions, sufficient cassettes should be used to get a reasonable estimate of short-term as well as 8 hour exposure. Samples are to be collected and analyzed in accordance with 29CFR 1910, Occupational Exposure to Asbestos and are to be analyzed using Phase Contrast Microscopy (PCM). Sample results must be transmitted to EPA and NJDEP within 24 hours of receipt using the spreadsheet provided by EPA.
Air Monitoring in Residential Areas within 1000 feet of Recycling Operations Air samples must be collected once a week from residential areas within 1000 feet of recycling operations. Samples should be taken using 40 CFR 763 Appendix A to Subpart E-- Interim Transmission Electron Microscopy Analytical Methods.
AMEC STEEL BID ADDENDUM 4 CORRECTED 1 01/08/02
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_008629515 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000407367
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000188105
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
4 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356836
List of marine surveyors for draft surveys related to WTC scrap bids.
5 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388741
Addendum to AMEC steel bid; references for WTC project materials and dates.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322394
Addendum for steel bid with NYC project code references.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269326
Bid addendum for WTC steel, dated 12/3/01, associated with AMEC and NYC project 211909.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386535
Addendum for steel bid related to World Trade Center project, NYC DoD.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000188096
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322488
Addendum document for AMEC steel bid related to World Trade Center project.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339435
Addendum covering steel bid details and adherence guidelines for steel recycling.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356804
Addendum for steel bid; NYC WTC recovery project reference.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267194
Addendum to AMEC steel bid for NYC WTC; bid details and document identifiers.
4 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000235110
Addendum #4 to the World Trade Center steel bid dated December 3-5, 2001.
3 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388765
Addendum/guide on sampling SOF in WTC steel and EPA/NJDEP oversight.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339441
Corrected addendum on SOF handling and weekly sampling requirements.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267175
Addendum for steel bid and asbestos handling for WTC project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322569
Addendum discussing sampling requirements for spray-on fireproofing on WTC steel.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339654
Lab report addendum on SOF asbestos handling; guidelines for bidders and sampling protocols.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322494
Corr/notes on sampling of spray-on fireproofing and worker monitoring per NY guidelines.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.
Similar indexed content
NYC-WTC_000356836
List of marine surveyors for draft surveys related to WTC scrap bids.
Similar indexed content
NYC-WTC_000388741
Addendum to AMEC steel bid; references for WTC project materials and dates.
Similar indexed content
Addendum for steel bid with NYC project code references.
Similar indexed content
NYC-WTC_000269326
Bid addendum for WTC steel, dated 12/3/01, associated with AMEC and NYC project 211909.
Similar indexed content