Daily work force report, night shift, World Trade, Jan 2002

Machine-extracted title · confidence 28%

Night shift labor and equipment listing for World Trade site, Jan 10, 2002.

NYC-WTC_000389527
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. )51-45 6mRoad. Whitestone, N.Y. 1,357- (718) 787-9000 DATE: 1-10-02 NIGHT PRELIMINARY

DAILY WORK FORCE REPORT 1

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor II Equipment CLASSIFICATION QUANT. Descripbon [MANNED STANDBY IDLE ^PERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER CAT973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT375 BUCKET 1 LABORERS 17 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 <? HITACHI 550 BUCKET 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 2 TOOL VAN 6 ROLL OFF DUMP TRAILERS LOW BED TRAILER lELIVERIES; HIGH DECK TRAILERS ■ WELDING TRUCK ■ FUEL TRUCK 1 ' PICKUP TRUCKS 3 ■ LIGHT TOWERS 15 ■ sitemule 3 ■ DUMP TRUCKS ■ 10WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ‘ CARGO BOXES 4 ■ FLAT TRUCK 1 ' PUMP 2 ■ RAINMAKER/GENIE LIFT 1

Description of Work: ANTICIPATED WORK__________________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_____________________________________________________ MAN WATERING STATIONS FOR DUST CONTROL______________________________________________________ LOADS OUT:___________ _______________________________________________________________ _______________ EUKES OUT:

GRACE CONTRACTING CORPj- Approved By: Title: I SUPERINTENDENT ' " ’ For; 04.028524

DAILY WORK FORCE REPORT01 lON.xJs

CITY_21MC100_003793915

NYC-WTC_000389527

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000389527Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →