Daily work force report, World Trade, Dec 13 2001

Machine-extracted title · confidence 25%

Night shift daily workforce and equipment at World Trade site, Dec 13, 2001.

NYC-WTC_000389490
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

RAGE CONTRACTING CORP. ^-45 6lh Road. WWIestona. N.Y. 113SZ-(718) 767.9000 DATE; DECEMBER 13,2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions VERY MILD AND FOGGY

r Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE Superintendent 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN 1 ' CAT 365 GRAPPLER 1 SAFETY OFFICER ■ CAT 375 GRAPPLER 1 LABORERS 19 ■ HITACHI 750 GRAPPLER 1 MIRON WORKERS " HITACHI 550 GRAPPLER 1 BlOCAL 14 5 ' HITACHI 550 GRAPPLER 1 LOCAL 15 8 ' HITACH11200 GRAPPLER ' 1 CARPENTER [185 CFM COMPRESSOR" 1 CARPENTER FOREMAN ' 235 HAMMER HOE RAM 1 TEAMSTERS 1 ■ MECHANICS TRUCK 1 1 MECHANICS 1 ■ TOOL TRUCK HOUSE WRECKERS 9 ■ TOOL VAN ' ROLLOFF ■ DUMP TRAILERS ^■^0 AND 375 PULLING MATERIAL FROM SLOPE ■ LOW BED TRAILER ^^MrTH OF VISTA & PASSING TO TO 750 ■ 750 LOADING ■ HIGH DECK TRAILERS ' "lLY EUKES S FLATS IN BOTTOM OF PIT 1 ■ WELDING TRUCK ■

973 ALSO LOADING IN BOTTOM______________________ ■ FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS ' PICKUP TRUCKS 2 ■ LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE ■ SITE MULE 3 ■ DUMP TRUCKS 973 LEAKING MOTOR OIL ■ 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE OFFICE TRAILER/GENER. 1 CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD ■ FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW ' PUMP 2 78 OUT OF AMEC (53 GRACE. 25 DOS/DOT) ■ ROLLER ■ RAINMAKER/GENIE LIFT 1 ijsSO BUCKET 1 Description of Work: WORK PERFORMED__________ LOAD OUT STEEL ANO DEBRIS__________________________________ MANNED TARPING AND TRIMMING STATIONS____________________ MANNED WATER STATIONS FOR DUST CONTROL________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2

SET MATS FOR TIEBACK INSTALLATION ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP

BY: 44, SUPERINTENDENT *

□4,028470 DAILY WORK FORCE REPORT 1213N.xls

CITY_21MC100_003793861

NYC-WTC_000389490

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000389490Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →