NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Nov 24, 2001

Machine-extracted title · confidence 28%

Final daily workforce and equipment for World Trade Center, Nov 24, 2001.

NYC-WTC_000389459
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CONTRACTING CORP. .4S61hRo.id. Whileslone. N.Y. ,1357-(716)767-9000 DATE: SATURDAY NOVEMBER 24.2001. DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract Iio. Weather C onditions ===S=3=S== Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE] SUPERIN TENDENT 1 ICAT 966 LOADER 1 PROJEC''ENGINEER 1 :AT 446 BACKHOE 1 OFFICE E NGINEER ,3AT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORE 7S 19 HITACHI 750 GRAPPLER 1 IRON WORKERS LOCAL 14 1 5 HITACHI 550 GRAPPLER HITACHI 550 GRAPPLER I 1 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPEh TER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMS!ERS 9 TOOL TRUCK 2 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 6 ROLL OFF DUMP TRAILERS 5 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS S ■ PARTS TRUCK 1 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER 1 ■ CARGO BOXES 3 ■ FLAT TRUCK ' PUMP ■ DOT A—J C.'Sd^ Heu 2 ~pos 4 ' [CAT 235 HOE RAM 1

Description of Work:

MANh ED TARPING AND TRIMMING STATIONS__________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL______________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 TRUCKING: WE MOVED 2 DOS TO TULLY AND 2 OF 4 DOT TO TULLY TO HELP THEM BACKFILL THE ARE/. IN WHICH HIS 320 FELL 40'. THIS WAS DONE AT 11:00 AM WZ PERMISSION OF BOVIS._______ LOADS OUT 98 ,

GRACE CONTRACTING CORP Approved By: Title: ■' For: BY:<— SUPERINTENDENT 1 194.028431

CITY_21MC100_003793826

NYC-WTC_000389459

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000389459Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →