NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Oct 2001

Machine-extracted title · confidence 21%

Daily workforce and equipment report for World Trade site, Oct 16, 2001.

NYC-WTC_000389418
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.458U1 Road. WWIeslono. N.Y. 11357-(718)787-8000 DATE; OCTOBER 16. 2001 (DAY)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANTIT Description MANNED IDLE SUPERINTENDENT 3 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 245 GRAPPLER SAFETY OFFICER 1 CAT 235 GRAPPLER 2 LASORERS 21 ■ HITACHI 750 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 2 LOCAL 14 5 ■ HITACH11200 1 LOCAL 15 8 ■ CHERRY PICKER 1 CARPENTER ■ COMPACTION TRUCK CARPENTER FOREMAN 2 ■ MECHANICS TRUCK 2 TEAMSTERS 16 ■ TOOL TRUCK 1 MECHANICS 5 ■ TOOL VAN HOUSE WRECKERS 5 ■ DUMP TRAILERS 9 ■ LOW BED TRAILER ■ HIGH DECK TRAILERS 6 ' WELDING TRUCK 1 ■ FUEL TRUCK 1 ■ PICKUP TRUCKS 5 ■ LIGHT TOWERS 6 ■ PARTS TRUCK 1 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ' LIQUID OXYGEN 9 ■ OXYGEN TRAILER 1 ■ OXYGEN 80 ■ ACETELYNE (MED) 10 ■ ACETELYNE (LARGE) 20 ■ OFFICE TRAILER 1 ■ TUBE TRAILER 3

Description of Work; EXCAVATED & REGRADED CENTER STRIP OF WEST ST BETWEEN ALBANY &LIBERTY FOR PLACEMENT OF SIX INCHES OF ASPHALT.________________________________________________________________________ NO WORK WAS DONE TILL 4 PM WHEN DECISION WAS MADE TO START THE REMOVAL OF THE FALLEN WEST WALL. ASSISTANCE WAS GIVEN FOR THE PULLING OF THE WALL BY 2 - 750 MACHINES I MANNED WATER HOSES FOR DUST CONTROL________________________________ OPERATE TARPING STATION_________________________________________________ MAINTAIN TRAFFIC FLOW OF TRUCKS IN & OUT OF WORK AREA________________ LOADS OUT 3

GRACE CONTRACTING CORP 04.028365 Approved By: TiHe: BY; For; SOPERlNTENOeNT

CITY_21MC100_003793767

NYC-WTC_000389418

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000389418Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280699

Daily workforce report for World Trade site with classification and equipment list.

Similar indexed content

Compare copies and versions →