Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Daily workforce report for World Trade site, listing personnel and equipment.
NYC-WTC_000389391OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone, N.Y. 11357.(718)767-9000 DATE; SUNDAY NOVEMBER 25, 2001 DAY (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION UANTIT Description JiMANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER i .FOREMEN___________ 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 23 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 3 MECHANICS TRUCK 2 TEAMSTERS 9 TOOL TRUCK 2 MECHANICS 3 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 6 DOT DUMP- 4 LOW BED TRAILER DOS DUMP-2 HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 9 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIEL(DUST SUPR) 1 GENERATOR 1 CAT 235 HOE RAM 1 Description of Work; _____ ___ __________________________________________________________ LOADS OUT: 102_________________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS____________________________________________________________ MAN WATER STATIONS FOR DUST CONTROL________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA______________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND CREATING THE RAMP AT THE NORTH / WEST CORNER & WORKING EAST TO B5-B6 &SOUTH TO MEET ROADWAY FROM B5-B6.
GRACE CONTRACTING CORP Approved By; Title;_______ BY: For; SUPERINTENDENT
Q1.30Q275
CITY_21MC100_003789205
NYC-WTC_000389391
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279987
Daily workforce roster for World Trade Center site, November 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305037
Day final daily workforce and equipment at World Trade site, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388351
Day final daily workforce and equipment, World Trade Center site, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280070
Daily workforce and equipment listings for World Trade Center site, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302500
Night preliminary daily workforce report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305199
Final daily workforce report for World Trade Center, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388362
Night shift daily workforce and equipment at World Trade site, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279987
Daily workforce roster for World Trade Center site, November 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305037
Day final daily workforce and equipment at World Trade site, Nov 25, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388351
Day final daily workforce and equipment, World Trade Center site, Nov 25, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
Similar indexed content
NYC-WTC_000279987
Daily workforce roster for World Trade Center site, November 2001.
Similar indexed content
NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
Similar indexed content
NYC-WTC_000305037
Day final daily workforce and equipment at World Trade site, Nov 25, 2001.
Similar indexed content
NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
Similar indexed content