Daily work force report, World Trade site, Dec 2001

Machine-extracted title · confidence 28%

Day final daily workforce report for World Trade Center, December 2, 2001.

NYC-WTC_000388463
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ISMSBIhRoad. WhitMttn*. N.Y. 11357-(718)767-8000 DATE: DECEMBER 2, 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor I Equipment CLASSIFICATION UANTIT II Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 'foremen 2 CAT365GRAPPLER 1 SAFETY OFFICER 1 CAT375GRAPPLER 1 LABORERS 24 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 7 I HITACH11200 GAPPLER~ 1 CARPENTER [185 CFM COMPRESSOR 1 CARPENTER FOREMAN 3 11235 HAMMER HOE RAM ~ 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 3 TCX3L TRUCK 2 HOUSE WRECKERS 6 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK IlFLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER 1

Description of Work:__________________________________________________________________ LOADS OUT: 67 CONTINUE TO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC._____________ MAN TARPING AND TRIMMING STATIONS______________________________________________ MAN WATER STATIONS FOR DUST CONTROL__________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2 & REMOVE TOP LAYER OF STEEL___________ EXCAVATE TWOARD SOUTHEAST CORNER OF VISTA HOTEL

GRACE CONTACTING CORP. Approved By: Title: For: SUPERINTENDENT

CITY_21MC100_003715672

NYC-WTC_000388463

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388463Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280703

Final daily workforce report for World Trade site with manned/idle equipment and staff.

Similar indexed content

Compare copies and versions →