GRACE CONTRACTING CORP. 151-45 BIh Road, WWteatone, N.Y. 11357-(715) 757-8000 DATE: December 3, 2001 MONDAY FINAL ___________________________________ DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Eciulpment sass ■aaMtaOBBSSsa CLASSIFICATION QUANT. I Description MANNED STANDBY Idle ISUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 19 [HITACHI 750 GRAPPLER 1 IRON WORKERS 1 [HITACHI 550 GRAPPLER 1 LOCAL 14 9 [HITACHI 550 BUCKET 1 LOCAL 15 14 HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 2 HOUSE WRECKERS 5 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS 2 6 FREON DETECTORS WELDING TRUCK FUEL TRUCK 1 16 LOADS DOT MILLINGS PICKUP TRUCKS ~ 5 [light TOWERS ~ 13 SITE MULE 3 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 NOTE: 13 LIGHT TOWERS USED 2.5 HOURS FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work: LOADS OUT: LOADS OUT: 55 TRAILERS_____________________________________________________________________________ LOADS OUT: 110 YOKES_______________________________________________________________________________ LOAD OUT STEEL AND DEBRIS_________________________________________________________________________ MANNED TARPING AND TRIMMING STATIONS____________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY PREP FOR THE BURNING OF THE SW CORNER COUJMNBEAMS ____
GRACE CONTRACTING CORP Approved By: Title: ■ BY: "For SUPERINTENDENT
DAILY WORK FORCE REPORT1203D.xls
CITY_21MC100_003701449
NYC-WTC_000388459
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000432489
Final daily workforce report for World Trade Center construction, Dec 3, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389471
Daily workforce and equipment at World Trade site, Dec 3, 2001 (MONDAY FINAL).
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269186
Final daily workforce and equipment summary for World Trade Center night shift.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305613
Crew and equipment listings for World Trade Center project on December 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429733
Day shift daily labor/equipment roster for World Trade Center site, Dec 8, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388482
Final daily workforce report for World Trade site, Grace Contracting, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361544
Daily workforce and equipment at World Trade Center site, Dec 8, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280840
Day final daily workforce and equipment at World Trade, Jan 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000432489
Final daily workforce report for World Trade Center construction, Dec 3, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389471
Daily workforce and equipment at World Trade site, Dec 3, 2001 (MONDAY FINAL).
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269186
Final daily workforce and equipment summary for World Trade Center night shift.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305613
Crew and equipment listings for World Trade Center project on December 4, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269184
Night shift daily workforce with equipment allocations for World Trade Center site.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000432489
Final daily workforce report for World Trade Center construction, Dec 3, 2001.
Similar indexed content
NYC-WTC_000389471
Daily workforce and equipment at World Trade site, Dec 3, 2001 (MONDAY FINAL).
Similar indexed content
NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
Similar indexed content
NYC-WTC_000269186
Final daily workforce and equipment summary for World Trade Center night shift.
Similar indexed content
NYC-WTC_000305613
Crew and equipment listings for World Trade Center project on December 4, 2001.
Similar indexed content