Daily work force report, World Trade, Dec 2001

Machine-extracted title · confidence 42%

Thursday night final daily workforce report for World Trade site; includes equipment.

NYC-WTC_000388407
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTFIACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: THURSDAY 12/27/01 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions Windy & Cold

Labor Equipment ' --- CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 3 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 375 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER" 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN II235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN CAT 365 GRAPPLER 1 DUMP TRAILERS LOW BED TRAILER All machines worked in bottom of pit. 1200/375 - 1 were HIGH DECK TRAILERS working around Vista digging into B6 level. 1200 during WELDING TRUCK ~ the course of the night broke a hard line to the stick - this FUEL TRUCK ~ 1 was repaired an the 1200 went back to work worked until 4:30 PICKUP TRUCKS ~ . 2 developed overheating problems. 375 early in the AM worked LIGHT TOWERS 13 with Gateway & pulled a chiller from the chiller room. 375 SITE MULE 3 worked south of Vista - loading eukes. 750 was working | DUMP TRUCKS north of the north wall tower 2 until it broke a hydraulic line 10 WHEEL DUMP TRUCK and was replaced with 375 - 2 FLASHING ARROW BOARD 1 973 worked in bottom of pit loading eukes. OFFICE TRAILER/GENER. 1 Trucking summary on separate sheet CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work:

CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL__________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA

GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPERINTENDENT ’

DAILY WORK FORCE REPORT1227N.xls

CITY_21MC100_003701219

NYC-WTC_000388407

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388407Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →