NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 38%

Night final daily workforce record for World Trade Center, Dec 8, 2001.

NYC-WTC_000388376
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: SATURDAY DECEMBER 8, 2001 (NIGHT FINAL)

DAlUV WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions COLD RAIN ALL NIGHT 4 Labor 2 Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS TOOL TRUCK HOUSE WRECKERS 6 TOOL VAN ROLLOFF EXCAVATED SOUTH TOWER DEBRIS TOWARDS WEST DUMP TRAILERS 8 LOADED TULLYS EUKES LOW BED TRAILER HOERAMMED CONCRETE ON REMAINS OF NORTH WALL HIGH DECK TRAILERS 2 1200 DOWN WHEN SHIFT STARTED - Ij^EPAIRED THEN WELDING TRUCK GRAPPLE BROKE - REPLACED WITH 7)50__________ FUEL TRUCK 1 RECEIVED NEW GRAPPLE FOR 1200 TONITE PICKUP TRUCKS 1 235 DAMAGED - FUEL TANK LEAKINGjAND HYDRAULIC LIGHT TOWERS 13 LEAK FROM UNDERCARRAGE SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work:________________ _____________ _________________ _____________________________________ LOADS OUT: 64 LOADED 43 EUKES ____________________________________________________________________ LOAD OUT STEEL AND DEBRIS MANNED TARPING AND TRIMMING STATIONS_____________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY

ELEVATIONS: ALL MACHINES LEVEL'B-5 253_____________________________________________________________ DELAYS: GRACE CONTRACTING CORP Approved By; Title: “ BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT1208N.xls

CITY_21MC100_003701178

NYC-WTC_000388376

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388376Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →