Daily work force report, World Trade, Dec 2001 (Day)

Machine-extracted title · confidence 36%

Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.

NYC-WTC_000388369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-46 6th Road. WhHoslono. N Y. 11357.(718)767-9000 DATE: DECEMBER 5, 2001 (DAY ) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 24 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: AWISCO HIGH DECK TRAILERS 3 ABCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 LIGHT TOWERS USED FOR 2.5 HOURS FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:____________________________ ________________________________________________________ DELAYS: 2:30-4:00 PM ALL WORK STOPPED______________________________________________________________ LOAD OUT STEEL AND DEBRIS_________________________________________________________________________ MANNED TARPING AND TRIMMING STATIONS____________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL ____________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA____________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS_______________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253 ______________________________________ > LOADS OUT 53 YUKE LOADS 35 / I ~ GRACE CONTRACTING CORP^ ( Approved By: rme: For: 71 SUPERINTENDENT

DAILY WORK FORCE REPORT 1205D.xls

CITY_21MC100_003701169

NYC-WTC_000388369

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388369Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280005

Night shift labor and machinery at World Trade Center, December 4, 2001.

Similar indexed content

NYC-WTC_000280001

Night shift labor and equipment at World Trade Center, Grace Contracting, December 5, 2001.

Similar indexed content

Compare copies and versions →