NYC-WTC_000356723
Daily workforce and equipment entries for World Trade Center project, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗Daily workforce and equipment counts for World Trade site in Dec 2001.
NYC-WTC_000388361OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Roai , Whilostone, N.Y. 11357-(71B) 767-9000 DATE: DECEMBER 1.2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name 8 Location: World Trade Center Contract No Weather Conditions
Labor II Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE______ 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 18 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 Local 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTE 3 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS_________ 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 AWISCO OXY/ACET WELDING TRUCK 1 AWISCO TIPS FUEL TRUCK 1 AWISCO OXY/ACET PICKUP TRUCKS 7 LIGHT TOWERS 9 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description Work: GATEWAY; 50 DELAYED 7 AM-1:15 PM SEARCH AND RESCUE PORT AUTH P D 365 1-2PM F IRE DEPT SEARCH IN SLURRY WALL NEAR PANEL 25____________ CONTINUE TO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC. MANNED T/,RPING AND TRIMMING STATIONS____________________________ MANNED WftTER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA iCONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING BAM VISTA 8. TOWER 2________________________________________ CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/ AMEC ELEVATIONS: 1200-264, 550-274, 375-284, 365-274 LOADS OUT 49 1-.-^ / o It Approved B^: Title:__________ byQzSy For: SUPERINTENDENT
CITY_21MC100_003701161
NYC-WTC_000388361
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000356723
Daily workforce and equipment entries for World Trade Center project, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361456
Daily workforce and equipment report for World Trade Center site on Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388710
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291363
Night shift workforce and equipment at World Trade Center, Dec 12-13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419098
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 28, 2001 (Day).
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419225
Final daily workforce summary for World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269221
Night preliminary daily workforce report for World Trade site; crews and gear listed.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000356723
Daily workforce and equipment entries for World Trade Center project, Dec 1, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361456
Daily workforce and equipment report for World Trade Center site on Dec 1, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000356723
Daily workforce and equipment entries for World Trade Center project, Dec 1, 2001.
Similar indexed content
NYC-WTC_000361456
Daily workforce and equipment report for World Trade Center site on Dec 1, 2001.
Similar indexed content
NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
Similar indexed content
NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
Similar indexed content
NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
Similar indexed content