NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Nov 2001

Machine-extracted title · confidence 35%

Daily workforce and equipment listing for World Trade Center site, Nov 11, 2001.

NYC-WTC_000388333
Page image
Scanned page image, NYC-WTC_000388333
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestona. N.Y. 11357-(718) 767-9000 DATE; NOVEMBER 11, 2001 DAY (FINAL)

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions =s Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER________ 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 24 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 6 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 MECHANICS TRUCK 2 TEAMSTERS_________ 13 TOOL TRUCK 2 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 9 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 4 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER 3 FLAT TRUCK 1 PUMP 2 ANGEL ARIEL(DUST SUPR) 1 85' GENIE LIFT 1

Description of Work;_______________________________________________________________________ 9 TULLY LOADS FROM SLURRY WALL LOADS OUT; 59_________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS___________________________________________________ MAN WATER STATIONS FOR DUST CONTROL .MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_____________________________________________ CONTINUE REMOVING DEBRIS TOWER 2___________________________________________________ DELAYS; 375 DELAYED 1 HOUR DUE TO UNSAFE WORK CONDITIONS CAUSED BY TULLY (0745-0845) _______ 1200 DOWN AT 5 PM - BROKEN GRAPPLE. STILL DOWN_______________________________ 1145 am - 3pm - EVERYTHING DOWN DUE TO PRESIDENTIAL VISIT

GRACE CONTRACTING CORP Approved By; Title; BY; For; SUPERINTENDENT

CITY_21MC100_006522145

NYC-WTC_000388333

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388333Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →