NYC-WTC_000360986
Labor force roster and equipment listings for World Trade construction work, Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗Night shift daily workforce for World Trade Center site, November 26, 2001.
NYC-WTC_000388261OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. ; j 1B1.45 6th Road, WhRestona, N.Y. 11357- (718) 7^7-9000 DATE: MONDAY 11/26/01 NIGHT (FINAL)
daily work force report
Job Name & Location: World Trade Center Contract No. Weather Conditions sas Labor __________ Equipment CLASSIFICATipN li UANTIT I Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER ~ 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN____________ 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 18 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 7 LOCAL 14 1 5 HITACHI 550 GRAPPLER 1 LOCAL 15 6 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN MECHANICS TRUCK 1 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 1 TOOL VAN HOUSE WRECKERS 10 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 9 PARTS TRUCK DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK PUMP 2
Description of Work: LOADS OUT: 99__________________ _____________________________ M^^^RPiNG^NpjRiMMiNGST^iONS22ZZZZZZZZZZZZZZZZZ MAN WATER STATIONS FOR DUST CONTROL_____________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________ CONTINUE REMOVING DEBRIS FROM VISTA HOTEL AND TOWER 2 BURN COLUMNS IN TOWER 2 , ,___________________________ HITACHI 1200 WORKED 6PM-9:30PM (BROKEN TOOTH ON GRAPPLE). 'note: one high DECK TRAILER USED BY AMEC FOR FULL SHIFT.
GRACE CONT, G iRP Approved By: Title: BY: Al . For; SUPERINTEND^
CITY_21MC1OO_OO37O1O22 N YC- WTC_000388261
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000360986
Labor force roster and equipment listings for World Trade construction work, Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305434
Night shift daily labor and equipment roster for World Trade Center site, November 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305581
Night shift daily workforce and equipment at World Trade site, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279731
Night shift labor/equipment summary for World Trade Center, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388717
Night shift daily workforce and equipment at World Trade Center site, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389394
Daily workforce report for World Trade site with labor and equipment counts.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291274
Night final daily workforce report for World Trade Center site, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408074
Night final daily labor/equipment report for World Trade Center, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280073
Daily labor/equipment listing for World Trade Center site, Nov 26, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429707
Daily workforce and equipment details for World Trade Center project, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361498
Day final daily workforce and equipment roster for World Trade Center site, Nov 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419274
World Trade Center site daily workforce and equipment list, Nov 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000360986
Labor force roster and equipment listings for World Trade construction work, Nov 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305434
Night shift daily labor and equipment roster for World Trade Center site, November 26, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305581
Night shift daily workforce and equipment at World Trade site, Nov 26, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279731
Night shift labor/equipment summary for World Trade Center, Nov 26, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388717
Night shift daily workforce and equipment at World Trade Center site, Nov 26, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389394
Daily workforce report for World Trade site with labor and equipment counts.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000360986
Labor force roster and equipment listings for World Trade construction work, Nov 2001.
Similar indexed content
NYC-WTC_000305434
Night shift daily labor and equipment roster for World Trade Center site, November 26, 2001.
Similar indexed content
NYC-WTC_000305581
Night shift daily workforce and equipment at World Trade site, Nov 26, 2001.
Similar indexed content
NYC-WTC_000279731
Night shift labor/equipment summary for World Trade Center, Nov 26, 2001.
Similar indexed content
NYC-WTC_000388717
Night shift daily workforce and equipment at World Trade Center site, Nov 26, 2001.
Similar indexed content