NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

DDC project workflow form, Oesien unit

Machine-extracted title · confidence 39%

DDC project workflow form including fee proposal and consultant WOL steps.

NYC-WTC_000387847
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4 Department of Design and Construction - Hazardous Materials Unit SIGNATURE

PROJECT n NAME «Sc LOCATION BORO

[ ] PREPARE ACKNOWLEDGEMENT LETTER TO PROGRAM UNIT (ATTACH PROJ HISTORY SHEET) [ ] 1 Acceptance Letter to Proceed Date Received [ ] 2 Refusal Letter Requesting More Dau Date Assigned [ i 3 Reactivation Letter Acceptmg Project [ ] 4 Temp Hold Pending Strategy Meetmg [ ] 5 Shelved Letter for Inactive Project [ ] 6 Acknowledge Inviution to Design Meetmg

[ ] PREPARE A REQUEST FOR A FEE PROPOSAL [ ] 1 Survev Fee Proposal Consultant Code_______ [ ] 2 Design Fee Proposal Date Fee Proposal Needed

[ ] PREPARE A WOL FOR A CONSULTANT (ATTACH FEE PROPOSAL WOL & SUPP WOL) [ ] 1 Survev - Standard Consultant Code Ong WOL a [ ] 2 Survev - Supplemental [ ] 3 Design - Standard Samples Analysis S or [ ] 4 Design - Supplemental Enable ACM PLM Analysis [ ] 5 Technician & Sample Analysis NOB-ACM PLM Analysis [ ] 6 Sample Analysis Only Fnable ACM TEM Analysis [ ] 7 Project/Construction Mgmt Services NOB-ACM TEM Analysis [ ] 8 Abatement Service Contractor Tech Hours___________ Technical/Labor Lump Sum Fee Original Fee Revised Fee___________

[ ] APPROVAL LETTERS FOR SURVEY & DESIGN (ATTACH PROJECT HISTORY SHEET) [ ] 1 Survey Approval w/Destgn Phase [ ] 2 Survev Approval w/o Design Phase Consultant Code [ ] 3 Design Approval - Prelunmary Phase [ ] 4 Design Approval - 50% Final Phase Work Order Lener rr [ ] 5 Design Approval - 70% Final Phase [ ] 6 Design Approval - 100% Final Phase Supplemental WOL # [ ] 7 Design Approval - Compliance Phase [ ] 8 Design Approval - Additional Services Approval Date [ ] 9 Construction Services - Acceptance

[] OTHER SERVICES REQUESTED [ ] 1 Prepare an ACP Form [ ] 2 Type, Edit a memo, letter, etc [ ] 3 Distribute the finished/Approved/Signed Document [ ] 4 Prepare Construction Section WOL (Attach Deuiled Cost Est & Field Sheets) [ ] 5 Process Parking Violation (Attach Onginal Ticket & Operator Affidavit)

Clerical Section will NOT process your request without supporting documents

DATE REQUESTED. DATE NEEDED SUBMITTED BY

SUPERVISOR'S APPROVAL. DATE_____________ DATE RECEIVED COMPLETED BY REVIEWED BY

NYC-WTC_000387847

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000387847Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →