NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

DDC project workflow form, Design unit

Machine-extracted title · confidence 39%

DDC project workflow form with signature sections and WOL options.

NYC-WTC_000387846
Page image
Scanned page image, NYC-WTC_000387846
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

( Department of Desieo and Construction - Hazardous Materials Unit SIGNATURE

PROJECT # NAME & LOCATION BORO

[ ] PREPARE ACKNOWLEDGEMENT LETTER TO PROGRAM UNIT (ATTACH PROJ HISTORY SHEET) [ ] 1 Acceptance Letter to Proceed Date Received [ ] 2 Refusal Letter Requestmg More Data Date Assigned [ ] 3 Reactivation Letter Acceptmg Project [ i 4 Temp Hold Pending Strategy Meetmg [ ] 5 Shelved Letter for inactive Project [ ] 6 Acknowledge Invitanon to Design Meetmg

[ ] PREPARE A REQUEST FOR A FEE PROPOSAL [ ] I Survey Fee Proposal Consultant Code_______ [ ] 2 Design Fee Proposal Date Fee Proposal Needed

[ ] PREPARE A WOL FOR A CONSULTANT (ATTACH FEE PROPOSAL WOL & SUPP WOL) [ ] 1 Survey - Standard Consultant Code Ong WOL# [ ] 2 Survey - Supplemental [ ] 3 Design - Standard Samples Analysis S or [ ] 4 Design - Supplemental Enable ACM PLM Analysis [ ] 5 Technician & Sample Analysis NOB-ACM PLM Analysis [ ] 6 Sample Analysis Only Fnable ACM TEM Analvsis [ ] 7 Project/Construction Mgmt Services NOB-ACM TEM Analysis [ ] 8 Abatement Service Contractor Tech Hours___________ Technicai/Labor Lump Sum Fee Original Fee Revised Fee___________

[ ] APPROVAL LETTERS FOR SURVEY & DESIGN (ATTACH PROJECT HISTORY SHEET [ ] 1 Survey Approval w/Design Phase [ ] 2 Survey Approval w/o Design Phase Consultant Code [ ] 3 Design Approval - Preliminary Phase [ ] 4 Design Approval - 50% Final Phase Work Order Lener n [ ] 5 Design Approval - 70% Final Phase [ ] 6 Design Approval - 100% Final Phase Supplemental WOL [ ] 7 Design Approval - Compliance Phase [ ] 8 Design Approval - Additional Services Approval Date [ ] 9 Construction Services - Acceptance

[] OTHER SERVICES REQUESTED [] 1 Prepare an ACP Form []2 Type, Edit a memo, letter, etc []3 Distribute the finished/Approved/Signed Document []4 Prepare Construction Section WOL (Attach Detailed Cost Est & Field Sheets) []5 Process Parkmg Violation (Attach Ongmal Ticket & Operator Affidavit)

Clerical Section will NOT process your request without supporting documents

DATE REQUESTED. DATE NEEDED SUBMITTED BY

SUPERVISOR'S APPROVAL DATE_____________ DATE RECEIVED COMPLETED BY REVIEWED BY

NYC-WTC_000387846

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000387846Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →