NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Dec 18, 2001 (Day)

Machine-extracted title · confidence 38%

Day shift daily workforce and equipment listing for World Trade site, Dec 18, 2001.

NYC-WTC_000386655
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I GFiACE CONTFIACTINGCORP. ISMS 6th Road. Whitestone, N.Y. 11357-1716)767-9000 DATE; DECEMBER 18, 2001 (DAY) FINAL DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditio is

Labor Equipment ! CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER I1 LABORERS 23 HITACHI 750 GRAPPLER IRON WORKERS J HITACHI 550 GRAPPLER 1 LOCAL 14____________ 6 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOI =MAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKE ;s 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER . • I DELIVERIES: AW 3CO_______ _ HIGH DECK TRAILERS AU! TER RUBBER WELDING TRUCK 1 I BU JKBEAR FUEL TRUCK 1 GFd CE ASPHALT 193.30 TONS W■ICKUP TRUCKS a LtIGHT TOWERS 13 SITE MULE 3 ’ DUMP TRUCKS •NOTE* 3 DUMP ' TAILERS RAN STONE TO FIX ROADWAY [|10 WHEEL DUMP TRUCK~ IIfLASHING ARROW SOAR'D 1 lloFFICE TRA1LER/GENER~ 1 CARGO BOXES .4 FLAT TRUCK 1 PUMP 2 ROLLER 1 ILIGHT TOWER SL iED FOR 3 HOURS Mrainmaker/genie lift ~ 1

Description of Worl ^DELAYS: 12:30- 2: 15 OUT OF HOLE FOR FULUNG OF BUILDING 1f6 DEL^y^l^GH^ )S DOWN TILL 2:30 TO FIX ROADWAY INSIDETOWERSIS^ MANNED TARPINi AND TRIMMING STATIONS MAINTAIN TRAFF i FLOW INTO AND OUT OF AREA MANNED WATER IG STATIONS FOR DUST CONTROL CONTINUE REMO 'ING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT SEE UMMARY

GRACE CONTRACTING CORP Approved By; Xi, TiUe; BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1218D.xls

CITY_21MC100_003695201

NYC-WTC_000386655

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386655Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →