NYC-WTC_000322824
December 5, 2001 day shift daily workforce and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Daily workforce and equipment listing for World Trade site, Dec 5, 2001.
NYC-WTC_000386644OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
I GRACE CONTRACTING CORP. SeihRoad. Whilestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 5, 2001 (DAY ) FINAL I DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
; Labor I[ Equipment CLASSIFICATION QUANT. [ Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER ~ 1 PROJECT ENGINEER 2 CAT 446 BACKHOE ~ 1 OFFICE ENGINEER |CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER . 1 LABORERS 24 HITACHI 750 GRAPPLER 1 IRON WORKERS _1_ HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15_____________ : 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN; 1 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER ■ IVERIES: AWISCO HIGH DECK TRAILERS 3 ABCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 [dump trucks 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES ■ 3 LIGHT TOWERS USED FOR 2.5 HOURS FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work:______________________________________________ DELAYS: 2:30-4:00 PM ALL WORK STOPPED___________________ _____ _______________________________________ LOAD OUT STEEL AND DEBRIS •________ _________ _ ___________________________________________________ __ MANNED TARPING AND TRIMMING STATIONS________________ _____ ________________________________________ MANNED WATER STATIONS FOR DUST CONTROL______________ ____________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_____________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS__________ _ ____________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253__________ ________ _ ___________________________________________ LOADS OUT 53 YUKE LOADS 35 . GRACE CONTRACTING CORP
fApproved By: ITitle: BY: SUPERINTENDENT
DAILY WORK FORCE REPORT 1205D.xls t i
CITY_21MC1OO_OO3695188
NYC-WTC_000386644
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000322824
December 5, 2001 day shift daily workforce and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278685
Day shift daily workforce and equipment at World Trade Center, December 5, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361544
Daily workforce and equipment at World Trade Center site, Dec 8, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386645
Night shift daily workforce and equipment listing for World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269186
Final daily workforce and equipment summary for World Trade Center night shift.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429733
Day shift daily labor/equipment roster for World Trade Center site, Dec 8, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278686
Night shift workforce and equipment counts for World Trade Center, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280829
Day shift daily workforce and equipment at World Trade, Jan 12, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280757
World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278681
Daily workforce and equipment tallies for World Trade Center, December 8, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000322824
December 5, 2001 day shift daily workforce and equipment.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278685
Day shift daily workforce and equipment at World Trade Center, December 5, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361544
Daily workforce and equipment at World Trade Center site, Dec 8, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386645
Night shift daily workforce and equipment listing for World Trade site, Dec 5, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388369
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000322824
December 5, 2001 day shift daily workforce and equipment.
Similar indexed content
NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similar indexed content
NYC-WTC_000278685
Day shift daily workforce and equipment at World Trade Center, December 5, 2001.
Similar indexed content
NYC-WTC_000361544
Daily workforce and equipment at World Trade Center site, Dec 8, 2001.
Similar indexed content
NYC-WTC_000386645
Night shift daily workforce and equipment listing for World Trade site, Dec 5, 2001.
Similar indexed content