NYC-WTC_000389460
Final daily workforce and equipment for World Trade Center, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗Night shift daily workforce report for World Trade project; lists personnel and machines.
NYC-WTC_000386616OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 15'-l6SlhRoad. Whileslone. N.Y. 11357-(718) 767.9000 DATE; MONDAY 10-22-01 NIGHT
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions: Cloudy, 55“ F
Labor Equipment CLASSIFICATION UANTIT Description MANNED IDLE SUPERINTENDENT 2 CAT 966 LOADER________ 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS________ 19 HITACHI 750 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACH11200 1 KOMATSU 650 GRAPPLER 1 LOCAL 15 7 COMPACTION TRUCK CARPENTER MECHANICS TRUCK 1 CARPENTER FOREMAN TOOL TRUCK 1 TEAMSTERS_________ • 17 TOOL VAN MECHANICS 1 ROLL OFF HOUSE WRECKERS 8 DUMP TRAILERS 8 LOW BED TRAILER 1 HIGH DECK TRAILERS 7 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 6 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK LIQUID OXYGEN 9 OXYGEN TRAILER 1 OXYGEN 80 ACETELYNE (MED) 10 ACETELYNE(LARGE) 20 OFFICE TRAILER 1 TUBE TRAILER 3
1 I Description of Work:________________________________________________ _____________ _________ CONTINUED REMOVING STEEL AND DEBRIS FROM SITE. REMOVED 100 TOTAL LOADS, OF WHICH 44 LOADS WERE DEBRIS AND 56 WERE STEEL. _______________________________________ MANNED WATERING STATIONS FOR DUST CONTROL_________________________________________ MANNED TARPING STATIONS___________________________ MAINTAINED TRAFFIC FLOW IN AND OUT OF WORK AREA___________________________________ REMOVING DEBRIS FROM NORTH SIDE OF TOWER #2 AND BETWEEN TOWER #2 AND VtSTA HOTEL; ONCE AGAIN SANITATION & DOT TRUCKS WERE ADDED TO THE GRACE TRUCKS BY DDC.________ JOB STOPPED FOR BOVIS SAFETY MEETING & DDC HEADCOUNT & EQUIPMENT CHECK. '________
GRACE CONTRACTING CORP i Approved By; ; Title: BY: I For:
CITY_21MC100_003695148
NYC-WTC_000386616
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000389460
Final daily workforce and equipment for World Trade Center, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432473
Day final daily workforce and equipment report for World Trade Center, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386627
Night shift daily workforce/equipment listing for World Trade site, Nov 2001.
1 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388433
Daily labor and equipment counts for World Trade project site on Nov 24, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302428
Final daily workforce report for World Trade Center site with equipment rundown.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278571
Night daily workforce and equipment at World Trade Center site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280818
Preliminary daily workforce and equipment for World Trade site, Jan 11, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305471
Night final daily workforce and equipment for World Trade Center site, jan 27 2002.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305045
Daily workforce and equipment report for World Trade Center site, November 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389426
Daily workforce report listing personnel and equipment at World Trade site, Oct 24, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000389460
Final daily workforce and equipment for World Trade Center, Nov 25, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432473
Day final daily workforce and equipment report for World Trade Center, Nov 25, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386627
Night shift daily workforce/equipment listing for World Trade site, Nov 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388433
Daily labor and equipment counts for World Trade project site on Nov 24, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302428
Final daily workforce report for World Trade Center site with equipment rundown.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000389460
Final daily workforce and equipment for World Trade Center, Nov 25, 2001.
Similar indexed content
NYC-WTC_000432473
Day final daily workforce and equipment report for World Trade Center, Nov 25, 2001.
Similar indexed content
NYC-WTC_000386627
Night shift daily workforce/equipment listing for World Trade site, Nov 2001.
Similar indexed content
NYC-WTC_000388433
Daily labor and equipment counts for World Trade project site on Nov 24, 2001.
Similar indexed content
NYC-WTC_000280754
Final page: World Trade Center workforce and equipment, Dec 5, 2001.
Similar indexed content