Daily workforce report, World Trade site, Oct 22 2001 (Night)

Machine-extracted title · confidence 44%

Night shift daily workforce report for World Trade project; lists personnel and machines.

NYC-WTC_000386616
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 15'-l6SlhRoad. Whileslone. N.Y. 11357-(718) 767.9000 DATE; MONDAY 10-22-01 NIGHT

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions: Cloudy, 55“ F

Labor Equipment CLASSIFICATION UANTIT Description MANNED IDLE SUPERINTENDENT 2 CAT 966 LOADER________ 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS________ 19 HITACHI 750 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACH11200 1 KOMATSU 650 GRAPPLER 1 LOCAL 15 7 COMPACTION TRUCK CARPENTER MECHANICS TRUCK 1 CARPENTER FOREMAN TOOL TRUCK 1 TEAMSTERS_________ • 17 TOOL VAN MECHANICS 1 ROLL OFF HOUSE WRECKERS 8 DUMP TRAILERS 8 LOW BED TRAILER 1 HIGH DECK TRAILERS 7 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 6 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK LIQUID OXYGEN 9 OXYGEN TRAILER 1 OXYGEN 80 ACETELYNE (MED) 10 ACETELYNE(LARGE) 20 OFFICE TRAILER 1 TUBE TRAILER 3

1 I Description of Work:________________________________________________ _____________ _________ CONTINUED REMOVING STEEL AND DEBRIS FROM SITE. REMOVED 100 TOTAL LOADS, OF WHICH 44 LOADS WERE DEBRIS AND 56 WERE STEEL. _______________________________________ MANNED WATERING STATIONS FOR DUST CONTROL_________________________________________ MANNED TARPING STATIONS___________________________ MAINTAINED TRAFFIC FLOW IN AND OUT OF WORK AREA___________________________________ REMOVING DEBRIS FROM NORTH SIDE OF TOWER #2 AND BETWEEN TOWER #2 AND VtSTA HOTEL; ONCE AGAIN SANITATION & DOT TRUCKS WERE ADDED TO THE GRACE TRUCKS BY DDC.________ JOB STOPPED FOR BOVIS SAFETY MEETING & DDC HEADCOUNT & EQUIPMENT CHECK. '________

GRACE CONTRACTING CORP i Approved By; ; Title: BY: I For:

CITY_21MC100_003695148

NYC-WTC_000386616

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386616Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →