Document / 1 page
Water quality report, WTC sump/dewatering, Feb 2002
Machine-extracted title · confidence 44%MTBE concentrations in sump and dewatering discharge across dates.
NYC-WTC_000386454More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
MTA Job Water Quality Report, Feb 26, 2002 · page 1NYC-WTC_000188020
Water quality report for the World Trade Center sumping and dewatering project at MTA Job #01-4906 covering data through February 26, 2002.
Similarity score 0.999 (not a probability)
Water quality data, WTC site, Jan 2002 · page 1NYC-WTC_000357197
MTBE and discharge tests for dewatering and sump water; date-specific results.
Similarity score 0.999 (not a probability)
MTA Job Water Quality Report, Dec 2001-Jan 2002 · page 1NYC-WTC_000188006
Water quality report for the World Trade Center sumping and dewatering project at MTA Job #01-4906 covering December 2001 to January 2002.
Similarity score 0.998 (not a probability)
Water quality tests, sump/dewatering, Feb 2002 · page 1NYC-WTC_000267130
MTBE discharge results from multiple labs for sump and dewatering at WTC site, Dec 2001–Jan 2002.
Similarity score 0.998 (not a probability)
Water quality memo, World Trade Center, Feb 2002 · page 1NYC-WTC_000290141
MTBE concentrations in sump and dewatering discharges for Feb 2002.
Similarity score 0.998 (not a probability)
Water quality data, MTBE discharges, WTC · page 1NYC-WTC_000290204
MTBE levels in sump and discharge waters from World Trade Center site, date range 2001-2002.
Similarity score 0.998 (not a probability)