NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Narrative, ATC Associates, PS 894 testing work

Machine-extracted title · confidence 48%

Narrative describing air, water testing and related costs at PS 894 (PS 425).

NYC-WTC_000385880–000385881
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DECLARATION NO: I PROJECT NO. I FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY I 826 Version 1 I 061-51000-22 03/18/03 B DAMAGE FACILITY WORK COMPLETE AS OF: /\ir Quality Testing____________ 09/10/02 100 %

w APPLICANT New York City. Board of Education COUNTY New York

NARRATIVE

ATC Associates conducted air and water testing at downtown schools. At Public School 894 (PS 894, also referred to as PS 425) commonly called the High School for Leadership & Public Services, between October 2001 and September 2002, air, dust and water testing was completed for asbestos, lead, metals, respirable particulates and portability.

Payment #1 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from November 2001 to February 2002, as indicated on payment, for BoE contract 3U75414. ATC Associates' eligible contract work for this invoice was divided in three categories: labor, equipment and testing. ATC Associates labor consisted of 2 administrative staff, 10 technicians and inspectors and 4 employees performing project management at a total cost of $43,632.50. ATC tested air, dust and water for metals, asbestos, lead, dioxin, PCB, particulate matter and portability, for a total cost of $133,231.10. ATC performed a very large number of asbestos and metal tests that increased analytical costs substantially at this period. Equipment used by ATC included different types of air monitors that were placed around the school, as well as handheld monitors that checked for respirable particulates. The equipment charges are per day, at a total cost of $5,905.00. See pages numbered 1-5 of electronic attachments. As a result of a BoE desk audit, this payment was reduced from $182,768.60 to $178,858.40. The total eligible contract cost for Payment #1 was $178,858.40.

Payment #8 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from March to April 2002, as indicated on payment, for BoE contract 3E75253. ATC Associates' eligible Uli contract work for this invoice was divided in three categories: labor, equipment and testing. ATC Associates labor consisted of 2 administrative staff, 15 technicians and inspectors and 7 employees performing project management at a total cost of $82,086.25. ATC tested air, dust and water for metals, asbestos, lead, dioxin, PCB, particulate matter and portability, for a total cost of $201,922.50. ATC performed a very large number of asbestos and metal tests that increased analytical costs substantially at this period. Equipment used by ATC included different types of air monitors that were placed around the school, as well as handheld monitors that checked for respirable particulates. The equipment charges are per day, at a total cost of $7,740.00. See pages numbered 6-8 of electronic attachments. The total eligible contract cost for Payment #8 was $291,748.75.

Payment #11 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from May to June 2002, as indicated on payment, for BoE contract 3E75253. ATC Associates labor consisted of 1 administrative staff, 11 technicians and inspectors and 7 employees performing project management at a total cost of $84,545.00. ATC tested air and dust for metals, asbestos, lead, dioxin, PCB and particulate matter, for a total cost of $175,361.00. ATC performed a very large number of asbestos and metal tests that increased analytical costs substantially at this period. Equipment used by ATC included different types of air monitors that were placed around the school, as well as handheld monitors that checked for respirable particulates. The equipment charges are per day, at a total cost of $13,265.00. See pages numbered 9-11 of electronic attachments. The total eligible contract cost for Payment #11 was $273,171.00.

Payment #19 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from July to September 10, 2002, as indicated on payment, for BoE contract 3E75253. Although the invoice goes through October 2002, actual work for this period was complete as of September 10, 2002. ATC Associates labor consisted of 2 administrative staff, 6 technicians and inspectors and 1 employee performing project management at a total cost of $7,200.00. ATC tested air and dust for metals, asbestos, lead, dioxin, PCB and particulate matter, for a total cost of $8,772.50. Equipment used by ATC included different types of air w monitors that were placed aroimd the school, as well as handheld monitors that checked for respirable

CITY_21MC100_009223809

NYC-WTC_000385880

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385880Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411651

Narrative on air and dust testing at PS 833; funding and reimbursement notes.

Similar indexed content

Compare copies and versions →