NYC-WTC_000369024
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
2. Cleaning shall not be considered compete unless the primary clearance levels are achieved. The apartment will be re-cleaned and retested if the primary clearance levels are not achieved. These clearance levels may be re-evaluated and revised if determined necessary based on field conditions and analytical limitations. Secondary clearance levels shall be considered in determining the need for additional cleanup, however failure to meet the secondary clearance levels does not automatically trigger the re-cleaning.
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within 5 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
5 of 5
CITY_21MC100_002862983
NYC-WTC_000369024
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000362908
Contract notes compliance with EPA/OSHA/NYS rules; direct assistance program for residents post-WTC.
1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407465
Pre-bid conference notice and background for asbestos abatement at 114 Liberty Street.
1 shared non-person entities · 1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140587
Contract scope defining regulations and procedures for residential dust cleaning, air sampling, and HEPA vacuuming.
1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162860
Revised scopes of work documents for 114 Liberty Street project.
1 shared non-person entities · 1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139460
Emails forwarding latest drafts of cleaning and air monitoring scopes of work for review and comment.
1 shared non-person entities · 1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139430
Emails forwarding latest drafts of cleaning and air monitoring scopes of work for review and comment.
1 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138743
EPA circulates latest draft scopes of work for WTC indoor dust cleaning program requesting comments.
1 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162352
EPA request for review and feedback on draft scope of work documents for WTC cleaning and air monitoring contractors.
1 shared non-person entities · 1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138659
Circulation of latest draft cleaning and monitoring statement of works for WTC for review and comment.
1 shared non-person entities · 1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155617
Distribution of revised draft scopes of work documents for the 114 Liberty Street project.
1 shared non-person entities · 1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161325
Final scope of work documents for indoor dust cleaning and monitoring contractor activities in WTC cleanup program.
1 shared non-person entities · 1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139029
EPA final scope of work documents for World Trade Center indoor dust cleaning and monitoring program forwarded to NYC project managers.
1 shared non-person entities · 1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000279056
Pre-bid scope and coordination for asbestos abatement monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000195796
Document outlining requirements for a pre-bid conference regarding asbestos abatement and air monitoring at a World Trade Center facility.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284079
Mandatory pre-bid and monitoring scope for asbestos abatement and air monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279016
Mandatory meeting notice for WTC-related remediation, site walk-through scheduled.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267357
Mandatory pre-bid meeting notice for WTC UNA scope at 125 Cedar Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000140587
Contract scope defining regulations and procedures for residential dust cleaning, air sampling, and HEPA vacuuming.
Similar indexed content
NYC-WTC_000362908
Contract notes compliance with EPA/OSHA/NYS rules; direct assistance program for residents post-WTC.
Similar indexed content
NYC-WTC_000162860
Revised scopes of work documents for 114 Liberty Street project.
Similar indexed content
NYC-WTC_000139460
Emails forwarding latest drafts of cleaning and air monitoring scopes of work for review and comment.
Similar indexed content
NYC-WTC_000139430
Emails forwarding latest drafts of cleaning and air monitoring scopes of work for review and comment.
Similar indexed content