Asbestos abatement scope, Murray Properties, Oct 2001

Machine-extracted title · confidence 28%

Scope of asbestos abatement for a building, outlining areas, debris, and cleaning methods.

NYC-WTC_000364364
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document OCT-18-2001 11:42 AM MURRAY.HIUU.PROPERTIES 212 58T 8495 r • wo

J •800-734-9947 NTS ASBESTOS UC.« AC46-1037 TEL; (516) 563-7300 CT ASBESTOS UC #000172 FAX; (516) 563-7389 CONTRACTOR UC.« 7531-HI

BRANCH SERVICES A Division of 192 Branch Interior Services. Inc. 101’2 Colin Drive • Holbrook, New York 11741

Scope of work.

All areas denoted on Hillman Environmental drawings showed asbestos containing dust and debris above one percent by weight All other areas stowed trace amounts or none detected. A large remote showering unit will be set up on the 10* floor as it is easily accessible from all floors via the stairwell. This area will be precleaned prior to placement of the decontamination unit. All denoted areas will be cleaned as an asbestos abatement prcgect in accordance with all die applicable repilations of N. Y.S. Industrial Code Rule 56 and N.Y,C. Title 15. All other areas of the building with light dust will be cleaned by others using HEPA vacuums and wet wiping methodology. Isolation barriers will be erected as necessary and/or appropriate. Barriers will be constructed oftwo layers of six-mil polyethylene sheeting. All areas adjacent to the work areas will be unoccupied for the duration of the project. H.E.P.A. filtered air filtration units will be set up in all areas to constantly filter the air and stop the asbestos fibers from entering uncontaminated portions of the space. We will clean all work areas and all contents using H.E.P.A. vacuuming and wet wiping methodology. All asbestos containing debris will be double bagged in 6 mil polyethylene asbestos bags and transported to a D.E.C. approved disposal site. A copy of the landfill waste manifest will be mailed to the owners upon our receipt.

The building has contracted Hillman Environmental as the independent third party consultant laboratory to perform air testing in conformance with New York City and State Law.

AU workers will have all necessary and required New York State, New York City and Federal licensing for their respective duties on the asbestos abatement project including but not limited to asbestos supervisor, asbestos handler and asbestos project designer. Please call me with any questions. R

Paul Napolitano Vice President

ENVIRONMENTAL CONSULTING & REMEDIATION Asbestos • Oil Spills • Hazardous Materials • Sooi & Smoke Removal ■ Fire Restoration ■ Water Damage

CITY_DEP_WORBY_CANNATA_SUBP_000001771

NYC-WTC_000364364

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000364364Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →