Interim final WTC study project report

Machine-extracted title · confidence 40%

Interim final report noting organizations involved and plan for third-party review.

NYC-WTC_000363060–000363182
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Post P' Cleaning Samples (Test 4E) - Three post-cleaning wipe samples were collected. All three samples were below the detection limit. The TEF for each sample was below the primary clearance criterion of 300 pg/m^.

Elevator Shaft/Compactor Room - This area consisted of an elevator shaft with a soil floor and an adjacent compactor room with a concrete floor. Construction was of cinder block walls and exposed floor joists.

Cleaning Method - This area was cleaned using Test 4A. Test 4A consisted of use of an industrial HEPA-filtered vacuum and an AFD. No wet wiping was performed.

Cleaning Results - This unit met the clearance criteria listed in Table 1.0 for each compound after being cleaned once.

Asbestos Before Cleaning Samples - There were no samples collected before cleaning.

Post P‘ Cleaning Samples - Three air samples were collected. The three air samples were analyzed using PCM, TEM AHERA, and PCMe. The three PCM results were all below the secondary numeric criterion of 0.01 ficc. Two of the three results were below the detection limit. Similarly, the TEM AHERA results were all below the secondary numeric criterion of 0.022 S/cc. All three of the samples were also below the detection limit. The PCMe results were all below the primary clearance criterion of 0.0009 S/cc, with all three of the samples below the detection limit.

Lead Before Cleaning Samples - There were no samples collected before cleaning.

Post f Cleaning Samples - Two air samples were collected after the first cleaning. The two air samples were below the detection limit.

MMVF Before Cleaning Samples - There were no samples collected before cleaning.

Post P‘ Cleaning Samples - Three air samples were collected after the first cleaning. MMVF was present in each of the three samples; however, the concentrations were below the primary clearance criterion of 10 S/L.

The Food Exchange - This unit is a 5,000 sq. ft. restaurant occupying three floors. The first floor is at street level with entrances from both Liberty and Cedar Streets. This floor was used for food service and customer dining. The lower level (basement) was used for food preparation and storage. The third level (sub-basement) was used for storage of restaurant equipment. Ceramic tile covers the floor area in both the dining room and the basement. The floor of the sub-basement is packed soil. All exterior windows had been blown inward depositing significant amounts of dust on all surface areas of the first floor. Minimal dust was present in the basement. The first

89

CITY_21MC100_011063459

NYC-WTC_000363151

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363151Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →